Laserfiche WebLink
CONTRACTORS QUALITY CONTROL REPORT (QCR) SUBMIT GAILY TO THE OA REPRESENTATIVE <br />DAILY LOG OF CONSTRUCTION - MILITARY REPORT NUMBER <br />3 4 8 <br />PROJECT <br />PAGE 2 <br />DATE <br />TO -0007 Remove 2 UST's, Install 1 AST 16 Apr 2001 <br />DDJC-Sharpe Site, CA CONTRACT NUMBER <br />DACWOS-00-D-0008 <br />4. PREP/INITIAL INSPECTIONS <br />Preparatory Inspection was held today for FORMWORK FOR AST PAD. <br />Preparatory Inspection was held today for SITE MOBILIZATION. <br />Initial Inspection was held today for SITE MOBILIZATION. <br />8. LABOR HOURS <br />The following Sub -Contractors had employees on site today: <br />Labor Number Of Hours <br />Sub -Contractor Classification <br />Employees Worked <br />GEOFON INC. LABORER, EXCAVATION (TERM) 1.0 <br />GEOFON INC. SUPERV -EXCAVATING 1.0 <br />8.0 <br />8.0 <br />Total hours on job site this day......... <br />16.0 <br />Total hours from start of construction <br />16.0 <br />CONTRACTOR CERTIFICATION: On behalf of the contractor, 1 certify that this report is complete and correct and all equipment <br />and material used and work performed during this reporting period are in compliance with the <br />contract plans and specifications, to the best of my knowledge, except as noted above. <br />QC R� T,ATIVE's S A URE DATE SUPERIN I i T'S INITIALS DATE <br />,r . �« <br />y � <br />o/ <br />