Laserfiche WebLink
L] <br />CONTRACTORS QUALITY CO OL REPORT (QCR) <br />SUBMIT GAILY TO THE EPRESENTATIVE <br />DAILY LOG OF CONSTRUCTION - MILITARY <br />REPORT NUMBER <br />351 PAGE 2 <br />PROJECT <br />DATE <br />TO -0007 Remove 2 UST's, Install 1 AST <br />19 Apr 2001 <br />DDJC-Sharpe Site, CA <br />CONTRACT NUMBER <br />DACWOS-00-D-0008 <br />Total hours from start of construction <br />64.0 <br />CONTRACTOR CERTIFICATION: On behalf of the contractor, I certify that this report is complete and correct and all equipment <br />and material used and work performed during this reporting period are in compliance with the <br />contract plans and specifications, to the best of my knowledge, except as noted above. <br />QC REPR`I ENTAT�VE's S1L�NA URE <br />DATE <br />SUPERINTENDEtUT'S INITIALS <br />DATE <br />