Laserfiche WebLink
HEALTH and SAFETY PLAN <br />Precissi Flying Service <br />�1, <br />FEB 07 1991 <br />Gi APER �NMENTAL i <br />! SERVICES <br />The site location for the proposed job of removing one (1) 10,000 gallon <br />aviation fuel tank as follows: <br />Precissi Flying Service <br />11919 N. Lower Sacramento (toad <br />Lodi, CA 95242 <br />The project manager, and the health and safety coordinator will be Burl <br />DuBose of Western Meter Service, Inc., 2735 Teepee Drive, Suite E, Stockton, <br />Ca 95205, (209) 948-6124. The site safety officers at the job site will be <br />Burl DuBose and/or Wesley DuBose of Western Meter Service. The alternate site <br />safety officer will be John Swets of Western Meter Service. <br />Western Meter Service will have on the site one (1) fire extinguisher <br />and one (1) first-aid kit within fifty (50) feet of the tank or areas where <br />flammable vapors are present. <br />Western deter Service, Inc. shall notify the local Fire Department 48 <br />hours before excavation shall begin. USA will also be notified before excava- <br />tion of job. <br />The tank must be empty of product before start of job. Western Meter <br />Service will triple rinse the tank with soap and water. Rinse will be pumped <br />from the tank and hauled away by Refineries Service, Inc., Patterson, Ca <br />95363, (209) 892.6742, a waste harardous hauler, for disposal. <br />The tank will be dry iced, 15 pounds of dry ice per 1,000 gallons, <br />before excavating. Western Meter Service shall monitor tank with a Combus- <br />tible Gas Indicator (CGI) and seal all openings before tank will be <br />transported. At no time will Western Meter Service cut or weld on the tank. <br />The tank will be secured on truck after extraction for transportation. <br />The tank and plumbing will be hauled by Redfearn Trucking, E. Mariposa Road, <br />Stockton, Ca, to Triangle Inc. of Sacramento, 3525 52nd Avenue, Sacramento, Ca <br />95823 to be destroyed. All of the above procedures will be done according to <br />code. <br />Western Meter Service will approach all tank excavation with possible <br />cave-ins. The following rules will be followed to prevent any mishaps: 1) <br />soil to be inspected for stability before and after tank is removed, 2) soil <br />is to be kept at least two (2) feet from the edge of an excavation, 3) if ex- <br />cavation is five (5) feetor more the hole shall be tapered, braced, or other <br />equivalent methods shall be used to prevent possible cave-ins. Precautions <br />will be taken at all times. <br />2735 TEEPEE DR., STE. E • STOCKTON. CA 95205 • (209) 948-6124 <br />