My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2008
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FAIRMONT
>
975
>
2300 - Underground Storage Tank Program
>
PR0231331
>
COMPLIANCE INFO_2007-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2023 10:36:46 AM
Creation date
6/3/2020 9:43:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2008
RECORD_ID
PR0231331
PE
2351
FACILITY_ID
FA0000513
FACILITY_NAME
LODI MEMORIAL HOSPITAL
STREET_NUMBER
975
Direction
S
STREET_NAME
FAIRMONT
STREET_TYPE
AVE
City
LODI
Zip
95240
APN
03107039
CURRENT_STATUS
01
SITE_LOCATION
975 S FAIRMONT AVE
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2351_PR0231331_975 S FAIRMONT_2007-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
347
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contractor Instructions <br /> November 11, 2007 <br /> Page 3 of 6 iota <br /> o Secondaries should be vacuum tested at 20-25 hg with air 50 psi air pressure on <br /> the primary piping. <br /> o Verify communication between termination points of all secondary containment <br /> piping. Air should be free flowing to all piping termination points <br /> o Installer must be onsite during pre testing and available to make necessary <br /> repairs. <br /> o The use of helium just prior to the arrival of our crew is strongly discouraged, as <br /> this may interrupt the flow of testing and require long periods of purging to occur. <br /> Particularly on site- utilizing flexible piping systems. If helium is used, purge <br /> primary and secondaries with clean air or nitrogen when testing has been <br /> completed. <br /> Note about Tanks: <br /> Tanks with dry interstice (non-brine filled interstitial) must have a second access port to <br /> the interstice (see iotaTankDrawing.pdf). The second interstitial tank fitting must be <br /> ordered with the tank and cannot be field installed. In addition the tank annular should <br /> be under vacuum as specified by the tank manufacturer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.