My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
2300 - Underground Storage Tank Program
>
PR0231021
>
COMPLIANCE INFO_2011-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2022 2:32:40 PM
Creation date
6/3/2020 9:44:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011-2015
RECORD_ID
PR0231021
PE
2361
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
01
SITE_LOCATION
2908 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231021_2908 W BENJAMIN HOLT_2011-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
394
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 0 <br />' S. SECONDARY PIPE TESTING <br />Page _3_ of _8_ <br />Test Method Developed By: ❑ Piping Manufacturer ® Industry Standard ❑ Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: ® Pressure ❑ Vacuum ❑ Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used: 0 —15 PSI GAUGES <br />Equipment Resolution: + / - 0.002" <br />Piping Material: <br />Piping Run # 87(1) <br />Piping Run # 87(2) <br />Piping Run # 91(3) Piping Run # <br />FIBERGLASS <br />FIBERGLASS <br />FIBERGLASS <br />Piping Manufacturer: <br />A.O. SMITH <br />A.O. SMITH <br />A.O. SMITH <br />Piping Diameter: <br />2"/3" <br />211/3" <br />2"/3" <br />Length of Piping Run: <br />255' <br />25' <br />255' <br />Product Stored: <br />87 <br />87 <br />91 <br />Method and location of <br />piping -run isolation: <br />TEST BOOT / STP <br />TEST BOOT / STP <br />TEST BOOT / STP <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />10 MIN <br />10 MIN <br />10 MIN <br />Test Start Time: <br />10:00 AM <br />10:00 AM <br />10:00 AM <br />Initial Reading (RI): <br />5.0 PSI <br />5.0 PSI <br />5.0 PSI <br />Test End Time: <br />11:00 AM <br />11:00 AM <br />11:00 AM <br />Final Reading (RF): <br />5.0 PSI <br />5.0 PSI <br />5.0 PSI <br />Test Duration: <br />1 HR <br />1 HR <br />1 HR <br />Change in Reading (RF -R,): <br />0 PSI <br />0 PSI <br />0 PSI <br />Pass/Fail Threshold or <br />Criteria: <br />NO LOSS <br />NO LOSS <br />NO LOSS NO LOSS <br />„ ., <br />PS s❑f' <br />❑ 1�t�1I.PaSS. <br />❑"4t]!) ❑` �a <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />REPAIRS WERE MADE AT 91(3) PRODUCT SECONDARY TERMINATION BOOT AT STP SUMP -- INSTALLED BLUE LINE <br />S.R. 3.5X2.40SA <br />REPAIRS WERE MADE ON BOTH 87(1) AND 91(3) PRODUCT SECONDARY TERMINATION TEST BOOTS INSIDE AT <br />PRODUCT PIPING SUMP -- INSTALLED BLUE LINE S.R. 3.5X2.40SA <br />
The URL can be used to link to this page
Your browser does not support the video tag.