My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2009
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
2701
>
2300 - Underground Storage Tank Program
>
PR0231176
>
COMPLIANCE INFO_2007-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2023 4:06:45 PM
Creation date
6/3/2020 9:46:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2009
RECORD_ID
PR0231176
PE
2361
FACILITY_ID
FA0003798
FACILITY_NAME
MARCH LANE 76*
STREET_NUMBER
2701
Direction
W
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95219
APN
11619007
CURRENT_STATUS
01
SITE_LOCATION
2701 W MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231176_2701 W MARCH_2007-2009.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
323
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, <br />Mr. John Fecteau <br />February 16, 2007 <br />Page 2 <br />rules and regulations. All fire and life safety aspects must be acceptable to the local <br />fire chief. Permits to install the Veeder-Root Phase Il balance EVR system may be <br />required by the San Joaquin Valley Air Pollution Control District and the Sacramento <br />Metropolitan Air Quality Management District (Districts) or other local agencies. In <br />addition Veeder-Root shall comply with all district permit conditions including testing . <br />and maintenance. Veeder-Root shall provide the ARB and Districts with any special <br />procedures, equipment, or tools for conducting tests or maintenance specified in the <br />District permit. <br />2. The uncertified equipment that maybe installed is listed. below: <br />*Veeder-Root shall provide ARB with a written description of the pressure management system at least <br />10 days before installation. <br />W. If the above facilities are to be used as certification test sites, verification shall be <br />provided to demonstrate that the test site achieved a minimum throughput of <br />150,000 gallons of gasoline per month for six months preceding test site <br />designation. <br />4. Veeder-Root shall notify ARB and Districts of the installation dates), so that ARB and <br />District staff has the opportunity to observe the installations. Veeder-Root shall also <br />provide written notice to ARB and the Districts within ten days after the installation of <br />all components confirming that the system is operating properly and is ready for <br />testing to begin. <br />5. Veeder-Root shall provide ARB and the Districts a minimum of ten working days <br />notification before conducting testing at the test sites. All test data collected at the <br />test sites shall be provided to ARB within 15 days after testing. <br />3 <br />Vapor Flow Meter <br />6 <br />N/A Veeder-Root <br />332374-001 <br />Vapor Pressure <br />1 <br />N/A <br />Veeder-Root <br />331946-001 <br />Sensor <br />TLS -ISD Software <br />1 <br />N/A <br />Veeder-Root <br />ISD 1.01 <br />Nozzles <br />12 <br />12 <br />VST <br />VST-EVR-NB <br />Coaxial Hose <br />12 <br />12 <br />VST <br />VDV-XXX <br />Break -Away <br />12 <br />12 <br />VST <br />VSTA-EVR-SBK <br />Pressure Data <br />1 <br />N/A <br />Veeder-Root <br />+5/-10 IWC <br />Logging System <br />Pressure <br />1 <br />N/A <br />Veeder-Root <br />Canister <br />Management* <br />*Veeder-Root shall provide ARB with a written description of the pressure management system at least <br />10 days before installation. <br />W. If the above facilities are to be used as certification test sites, verification shall be <br />provided to demonstrate that the test site achieved a minimum throughput of <br />150,000 gallons of gasoline per month for six months preceding test site <br />designation. <br />4. Veeder-Root shall notify ARB and Districts of the installation dates), so that ARB and <br />District staff has the opportunity to observe the installations. Veeder-Root shall also <br />provide written notice to ARB and the Districts within ten days after the installation of <br />all components confirming that the system is operating properly and is ready for <br />testing to begin. <br />5. Veeder-Root shall provide ARB and the Districts a minimum of ten working days <br />notification before conducting testing at the test sites. All test data collected at the <br />test sites shall be provided to ARB within 15 days after testing. <br />
The URL can be used to link to this page
Your browser does not support the video tag.