My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
401
>
2300 - Underground Storage Tank Program
>
PR0231346
>
COMPLIANCE INFO_2013-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2023 4:05:16 PM
Creation date
6/3/2020 9:47:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2018
RECORD_ID
PR0231346
PE
2361
FACILITY_ID
FA0003603
FACILITY_NAME
TESORO (SPEEDWAY XP) 68152
STREET_NUMBER
401
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04513019
CURRENT_STATUS
01
SITE_LOCATION
401 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231346_401 W KETTLEMAN_2013-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
620
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Test Method Developed By: ❑ Piping Manufacturer ® Industry Standard ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: ® Pressure ❑ Vacuum ❑ Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used: Test reducer boots, Nitrogen and gauges Equipment Resolution: 0.5% of span <br />Fpiping Run # 87 <br />Piping Run # 91 <br />Piping Material: <br />Fiberglass <br />Fiberglass <br />Piping Manufacturer: <br />Smith <br />Smith <br />Piping Diameter: <br />3" <br />3" <br />Length of Piping Run: <br />100' <br />100' <br />Product Stored: <br />Gasoline <br />Gasoline <br />Method and location of <br />piping -run isolation: <br />Reducer Boots/ Fittings <br />Reducer Boots! Fittings <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />10 minutes <br />10 minutes <br />JJ <br />Test Start Time: <br />12:00 pm <br />1:00 pm <br />- w <br />4, <br />Initial Reading (Rj): <br />5 psi <br />5 psi <br />Test End Time. <br />1:00 pm <br />2:00 pm <br />L <br />Final Reading (RF): <br />5 psi <br />5 psi <br />'T'est Duration: <br />1 hour <br />1 hour <br />g s <br />Change in Reading (RF -R,): <br />None <br />None <br />Pass/Fail Threshold or <br />Criteria: <br />No Detectable Loss <br />No Detectable Loss <br />Test Result: <br />O Pass 0 Fail <br />[R] Pass ❑ Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up fbr failed tests) <br />Both secondary lines were leaking from bravo hubs. Tightened hubs and re -tested lines. Lines stopped leaking. <br />a <br />
The URL can be used to link to this page
Your browser does not support the video tag.