Laserfiche WebLink
' <br />Test Method Developed By: ❑ Sump Manufacturer ® Industry Standard ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: ❑ Pressure ❑ Vacuum ® Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used: Incon Sump Tester Equipment Resolution: +/- 0.002" <br />STP Sump # 87 <br />STP Sump # 91 <br />Sump Diameter: <br />42" <br />42" <br />Sump Depth: <br />58" <br />58" <br />Sump Material: <br />Fiberglass <br />Fiberglass' <br />" <br />Height from Tank Top to Top of <br />Highest Piping Penetration; <br />22) <br />23. <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />19"193, <br />_ <br />FEB B <br />Condition of sump prior to testing: <br />Good <br />Good <br />HEALTH <br />Portion of Sump Tested' <br />2" above piping <br />2" above piping <br />1RUMMENTAL <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />product and water)?` <br />Q Yes ❑ No ®NA <br />❑ Yes Q No ®NA <br />DEPARTMENT <br />i Turbine shutdown response time <br />N/A <br />N/A <br />l Is system programmed for fail-safe <br />shutdown?` <br />❑ Yes ❑ No 0 NA <br />❑ Yes ❑ No ® NA <br />Was fail-safe verified to be <br />operational?* <br />® Yes ❑ No ® NA <br />❑ Yes ❑ No ® NA <br />Wait time between applying <br />pressure/vacuum/water and starting <br />test: <br />30 minutes <br />30 minutes <br />Test Start Time: <br />8:48 am <br />8:48 am <br />Initial Reading (Rj): <br />2.7156 <br />3.7598 <br />Test End Time: <br />9:03 am <br />9:03 am <br />Final Reading (RF): <br />2.7155 <br />3.7601 <br />Test Duration: <br />15 min. <br />15 min. <br />Change in Reading (RF -RI): <br />0.0001 <br />0.0003 <br />Pass/Fail Threshold or Criteria: <br />+/-0,00211 <br />+/- 0.002" <br />Test Result: <br />® Pass ❑ Fail <br />® Pass ❑ Fail <br />Was sensor removed for testing? <br />® Yes ❑ No ❑ NA <br />® Yes ❑ No ❑ NA <br />Was sensor properly replaced and <br />verified functional after testing? <br />® Yes Q No ❑ NA <br />® Yes ❑ No ❑ NA <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />"Sensor functionality was not confirmed. This procedure is not part of the Secondary Containment testing scope of work". <br />' If the entire depth of the sump is not tested, specify how much was tested. If the answer to gLny of the questions indicated with an <br />asterisk(*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />