My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1997
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
2420
>
2300 - Underground Storage Tank Program
>
PR0231382
>
COMPLIANCE INFO_1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2020 8:56:06 PM
Creation date
6/3/2020 9:48:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1997
RECORD_ID
PR0231382
PE
2361
FACILITY_ID
FA0004139
FACILITY_NAME
Plaza liquor and Gas
STREET_NUMBER
2420
Direction
W
STREET_NAME
TURNER
STREET_TYPE
RD
City
LODI
Zip
95242
CURRENT_STATUS
01
SITE_LOCATION
2420 W TURNER RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231382_2420 W TURNER_1997.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
397
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PREPARING THE SITE (cont A) Determine correct ct length of piping,then cut pipe with <br /> Step Five—Dispenser Sumps the Omniflex cutting tool, OC1500. <br /> A) Mount dispenser sumps B) Once the correct length has been cut from the pipe <br /> into dispenser island forms to available, trim the secondary cover with the OC1501 <br /> prepare for installation of pri- trimming tool. <br /> mary piping (see Dispenser <br /> Sump Instructions for addi- C) After the secondary cover <br /> tional information). is trimmed, measure 1-5/8" <br /> from each end of the primary <br /> Ste Six pipe and designate measure- <br /> Step ments with a marker. <br /> Install bulkhead fittings.For directions,refer to Bulkhead <br /> Fitting Instructions,BFI726,supplied with the fittings. <br /> Step Three—Coupling the Primary Pipe <br /> Step Seven A) Lubricate the inner surface <br /> Seat and support all tank sumps of the pipe and the inner sur- <br /> and dispenser sumps sonovoids face of the coupling with sili- <br /> in backfill are present under con spray. Push the primary <br /> sumps.Backfill should be even pipe onto the coupling. Insert <br /> with bottom of bulkhead en- the primary pipe until the 1-5/8" <br /> try,be careful to maintain mini- mark aligns with the bottom <br /> mum 1/8" per foot of slope to of the ferrule. Note: It is very <br /> next tank or dispenser sump. important that the pipe goes <br /> Note: Avoiding direct dump- all the way into the coupling. <br /> ing of backfill will help to elimi- <br /> nate sump distortion. <br /> ASSEMBLING THE PRIMARY PIPE <br /> 'Ok <br /> • Step One—Measuring the Pipe Ferrule <br /> A) Number the tank sumps and dispenser sumps and to mark <br /> record the numbers on the Site Layout Sheet(page 6).Also, <br /> label the piping runs between each sump.Note:Complete B) Check the diameter of the <br /> this step before cutting any pipe. mandrel expansion fingers <br /> when fully expanded with TCI <br /> - Go/No-Go gauge.If the diam- <br /> B) When taking measurements eter is out of tolerance,refer to <br /> from the tank sump, place the the TC-10 Coupling Machine <br /> tape at the face of the adaptor Manual (shipped with Cou- <br /> fitting and measure to the cen- pling Machine) to adjust the <br /> ter of the first dispenser sump. expansion diameter.Lubricate <br /> Be sure to allow for minimum 3' the mandrel fingers with metal <br /> bend radius. Once the tape is assembly paste(Dow Corning <br /> laid out properly, take 6" from Moly Kote G-n or equivalent) <br /> the final measurement. or redistribute paste before <br /> each coupling procedure. <br /> C) When taking measurements <br /> from dispenser sump to dis- <br /> penser sump,measure to the cen- <br /> ter line of each and subtract 8" <br /> from the overall length. <br /> Step Two—Cutting the Primary Pipe <br /> • Before cutting any pipe,compare the lengths needed to the <br /> lengths available at the site to determine which combina- <br /> tions reduce the scrap factor. This is not necessary when <br /> using coils. <br /> Page 2 - Omniflex Instructions <br />
The URL can be used to link to this page
Your browser does not support the video tag.