My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3425
>
2300 - Underground Storage Tank Program
>
PR0231416
>
COMPLIANCE INFO_2012-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2024 4:04:04 PM
Creation date
6/3/2020 9:48:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012-2018
RECORD_ID
PR0231416
PE
2361
FACILITY_ID
FA0003627
FACILITY_NAME
ARCO 02093
STREET_NUMBER
3425
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
21418020
CURRENT_STATUS
01
SITE_LOCATION
3425 TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231416_3425 TRACY_2012-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
599
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCI3, January 2002 <br />5. SECONDARY PIPE TESTING <br />Page _4_ of —9- <br />Test Method Developed By: <br />❑ Piping Manufacturer ® Industry Standard ❑ Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: <br />® Pressure ❑ Vacuum <br />❑ Other (Spec) <br />❑ Hydrostatic <br />Test Equipment Used: 0 —15 PSI GAUGES <br />Equipment Resolution: + / - 0.002" <br />Piping Run # 87(1) <br />Piping Run # 87(2) <br />Piping Run # 91 <br />Piping Run # 87S <br />Material: <br />rPiping <br />FIBERGLASS <br />FIBERGLASS <br />FIBERGLASS <br />FIBERGLASS <br />Manufacturer: <br />A.O. SMITH <br />A.O. SMITH <br />A.O. SMITH <br />A.O. SMITH <br />Piping Diameter: <br />2"/3" <br />2"/3" <br />2"/3" <br />3"/4" <br />Length of Piping Run: <br />125' <br />25' <br />125' <br />45' <br />Product Stored: <br />87 <br />87 <br />91 <br />87 <br />Method and location of <br />piping -run isolation: <br />TEST BOOT / <br />STP SUMP <br />TEST BOOT / <br />STP SUMP <br />TEST BOOT / <br />STP SUMP <br />TEST BOOT / <br />STP SUMP <br />ait time between applying <br />pressure/vacuum/water and <br />rtin test: <br />10 MIN <br />10 MIN <br />10 MIN <br />10 MIN <br />Test Start Time: <br />9:00 AM <br />9:00 AM <br />9:00 AM <br />9:00 AM <br />Initial Reading (RI): <br />5.0 PSI <br />5.0 PSI <br />5.0 PSI <br />5.0 PSI <br />Test End Time: <br />10:00 AM <br />10:00 AM <br />10:00 AM <br />10:00 AM <br />Final Reading (RF): <br />5.0 PSI <br />5.0 PSI <br />5.0 PSI <br />5.0 PSI <br />Test Duration: <br />1 HR <br />1 HR <br />1 HR <br />1 HR <br />Change in Reading (RF -RI): <br />0 PSI <br />0 PSI <br />0 PSI <br />0 PSI <br />Pass/Fail Threshold or <br />Criteria: <br />NO LOSS <br />NO LOSS <br />NO LOSS <br />NO LOSS <br />Teri Result: 0 Pass ❑ Fail O Pass ❑ Fail [I Pass ❑ Fail 0 Pass ❑ Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.