Laserfiche WebLink
SWRCB, January 2002 <br />6_ PIPING SUMP TESTING <br />Page _5_ of _9_ <br />Test Method Developed By: ❑ Sump Manufacturer N Industry Standard ❑ Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: ❑ Pressure ❑ Vacuum N Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used: INCON SUMP TESTER I Equipment Resolution: -+ / - 0.002" <br />Sump # 87(1) <br />Sump # 87(2) <br />Sump # 87(3) <br />Sump # 91 <br />Sump Diameter: <br />48" <br />48" <br />48" <br />48" <br />Sump Depth: <br />62" <br />63" <br />63" <br />63" <br />Sump Material: <br />FIBERGLASS <br />FIBERGLASS <br />FIBERGLASS <br />FIBERGLASS <br />Height from Tank Top to Top of <br />Highest Piping Penetration: <br />18" <br />18" <br />18" <br />20" <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />24" <br />32" <br />24" <br />24" <br />Condition of sump prior to testing: <br />DRY <br />DRY <br />DRY <br />DRY <br />Portion of Sump Tested' <br />ABOVE <br />PENETRATIONS <br />ABOVE <br />PENETRATIONS <br />ABOVE <br />PENETRATIONS <br />ABOVE <br />PENETRATIONS <br />Does turbine shut down when <br />10 MIN <br />10 MIN <br />10 MIN <br />10 MIN <br />sump sensor detects liquid (both <br />❑ Yes ❑ No N NA <br />❑ Yes ❑ No N NA <br />❑ Yes ❑ No N NA <br />❑ Yes ❑ No N NA <br />product and water)?* <br />6.5583" <br />3.6398" <br />6.7882" <br />1.2266" <br />Turbine shutdown response time <br />NIA <br />NIA <br />NIA <br />N/A <br />Is system programmed for fail-safe <br />❑ Yes [:]No N NA <br />[:]Yes ❑No [DNA <br />❑ Yes [:]No N NA <br />[-]Yes ❑No N NA <br />shutdown?* <br />15 MIN <br />15 MIN <br />15 MIN <br />15 MIN <br />Was fail-safe verified to be <br />« <br />❑Yes ❑ No N NA <br />[]Yes ❑ No N NA <br />[:1 Yes ❑ No N NA <br />[:]Yes ❑ No [DNA <br />operational? <br />Wait time between applying <br />pressure/vacuum/water and starting <br />test: <br />10 MIN <br />10 MIN <br />10 MIN <br />10 MIN <br />Test Start Time: <br />11:53 AM <br />11:22 AM <br />12:23 PM <br />12:40 PM <br />Initial Reading (Ri): <br />6.5583" <br />3.6398" <br />6.7882" <br />1.2266" <br />Test End Time: <br />12:08 PM <br />11:37 AM <br />12:38 PM <br />12:55 PM <br />Final Reading (RF): <br />6.5583" <br />3.6396" <br />6.7878" <br />1.2257' <br />Test Duration: <br />15 MIN <br />15 MIN <br />15 MIN <br />15 MIN <br />Change in Reading (RF -RI): <br />0.0000" <br />-0.0002" <br />-0.0004" <br />-0.0009" <br />Pass/Fail Threshold or Criteria: <br />+/-0.002" <br />+/-0.002" <br />+/-0.002" <br />+/-0.002" <br />Test Result: <br />Pass [],Fail <br />Z Pass ❑ Fail <br />0 Pass ❑ Fail <br />N Pass ❑ Fail <br />Was sensor removed for testing? <br />I N Yes ❑ No [:INA <br />N Yes ❑ No ❑ NA <br />N Yes ❑ No ❑ NA <br />N Yes ❑ No ❑ NA <br />Was sensor properly replaced and <br />verified functional after testing? <br />®Yes ❑ No [:1 NA <br />N Yes [--]No ❑ NA <br />N Yes ❑ No [--INA <br />N Yes ❑ No 11 NA <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />ABOVE IS THE LAST OF TWO BACK TO BACK 15 MINUTE TESTS <br />' If the entire depth of the sump is not tested, specify how much was tested. If the answer to M of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />