My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3425
>
2300 - Underground Storage Tank Program
>
PR0231416
>
COMPLIANCE INFO_2012-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2024 4:04:04 PM
Creation date
6/3/2020 9:48:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012-2018
RECORD_ID
PR0231416
PE
2361
FACILITY_ID
FA0003627
FACILITY_NAME
ARCO 02093
STREET_NUMBER
3425
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
21418020
CURRENT_STATUS
01
SITE_LOCATION
3425 TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231416_3425 TRACY_2012-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
599
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB; January 2002 <br />7. UNDER -DISPENSER CONTAINMENT (UDC) TESTING <br />Page _6_ of _9 <br />Test Method Developed By: <br />❑ UDC Manufacturer ® Industry Standard ❑ Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: <br />❑ Pressure <br />❑ Other (Spec) <br />❑ Vacuum <br />® Hydrostatic <br />Test Equipment Used: INCON SUMP <br />TESTER <br />Equipment Resolution: <br />+ / - 0.002" <br />IN=UDC <br /># 1/2 <br />UDC # 3/4 <br />UDC # 5/6 <br />UDC # 7/8 <br />UDC Manufacturer: <br />ENVIRON <br />ENVIRON <br />ENVIRON <br />ENVIRON <br />UDC Material: <br />FIBERGLASS <br />FIBERGLASS <br />FIBERGLASS <br />FIBERGLASS <br />UDC Depth: <br />31" <br />31" <br />31" <br />31" <br />Height from UDC Bottom to Top <br />of Highest Piping Penetration: <br />10" <br />10" <br />10.. <br />10" <br />Height from UDC Bottom to <br />Lowest Electrical Penetration: <br />N/A <br />N/A <br />N/A <br />N/A <br />Condition of UDC prior to <br />testing: <br />DRY <br />DRY <br />DRY <br />DRY <br />Portion of UDC Tested <br />ABOVE <br />PENETRATIONS <br />ABOVE <br />PENETRATIONS <br />ABOVE <br />PENETRATIONS <br />ABOVE <br />PENETRATIONS <br />Does turbine shut down when <br />UDC sensor detects liquid (both <br />product and waterp. <br />❑ Yes ❑ No ® NA <br />❑ Yes ❑ No ® NA <br />❑ Yes ❑ No ® NA <br />❑ Yes ❑ No <br />® NA <br />Turbine shutdown response time <br />N/A <br />N/A <br />N/A <br />N/A <br />Is system programmed for fail- <br />safe shutdown?" <br />❑ Yes ❑ No ® NA <br />❑ Yes ❑ No ® NA <br />❑ Yes ❑ No ® NA <br />❑ Yes ❑ No <br />® NA <br />Was fail-safe verified to be <br />operational?* <br />❑ Yes ❑ No ® NA <br />❑ Yes ❑ No ® NA <br />❑ Yes ❑ No ® NA <br />❑ Yes ❑ No <br />® NA <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test <br />10 MIN <br />10 MIN <br />10 MIN <br />10 MIN <br />Test Start Time: <br />8:33 AM <br />8:51 AM <br />8:33 AM <br />8:33 AM <br />Initial Reading (RI): <br />6.3941" <br />5.1748" <br />4.4911" <br />7.8123" <br />Test End Time: <br />8:48 AM <br />9:06 AM <br />8:48 AM <br />8:48 AM <br />Final Reading (RF): <br />6.3941" <br />5.1755" <br />4.4913" <br />7.8124" <br />Test Duration: <br />15 MIN <br />15 MIN <br />15 MIN <br />15 MIN <br />hange in Reading (RF -RI): <br />0.0000" <br />0.0007" <br />0.0002" <br />0.0001 " <br />LMss/FailThreshold or Criteria: <br />+/-0.00211 <br />+/-0.00211 <br />+1-0.00211 <br />+/-0.00211 <br />Result«�$#%Vass <br />❑ Fall <br />Z Pass Q,-Failss <br />CQ Feil <br />Was sensor removed for testing? <br />®Yes ❑ No ❑ NA <br />® Yes ❑ No ❑ NA <br />® Yes ❑ No ❑ NA <br />® Yes ❑ No <br />❑ NA <br />Was sensor properly replaced and <br />verified functional after testing? <br />®Yes [:]No ❑ NA <br />®Yes ❑ No [INA <br />®Yes [:1 No ❑ NA <br />®Yes [:1 No <br />[_1 NA <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />ABOVE IS THE LAST OF TWO BACK TO BACK 15 MINUTE TESTS <br />' If the entire depth of the UDC is not tested, specify how much was tested. If the answer to Any of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG -160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.