My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HOSPITAL
>
500
>
2300 - Underground Storage Tank Program
>
PR0231614
>
COMPLIANCE INFO_2006-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2021 1:21:17 PM
Creation date
6/3/2020 9:50:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2012
RECORD_ID
PR0231614
PE
2361
FACILITY_ID
FA0000086
FACILITY_NAME
San Joaquin General Hospital
STREET_NUMBER
500
Direction
W
STREET_NAME
HOSPITAL
STREET_TYPE
Rd
City
French Camp
Zip
95231
CURRENT_STATUS
01
SITE_LOCATION
500 W Hospital Rd
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231614_500 W HOSPITAL_2006-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
368
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 <br />0 Page of <br />Test Method Developed By: X Piping Manufacturer ❑ Industry Standard ❑ Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: X Pressure ❑ Vacuum ❑ Hydrostatic <br />❑ Other (Specify) <br />Test Equipment Used: Pressure Gauge <br />Equipment Resolution: 0-15 PSI <br />,...... ...,.. , t��,:...,�i.�tssis;,tv:._=�. �; �.;"��k',�� <br />_.. ;.. .'�` .:;;..:.'^4',t..�� <br />:•, •'N �'v`. •tr,t""9w..a���•..«'�..,^�,y <br />gcs,,^€;��� .�; x%�4;, t�.#�.g: <br />Piping Run # 1 <br />Piping Run # 2 <br />Piping Run # <br />Piping Run # <br />Piping Material: Fiberglass <br />Fiberglass <br />Piping Manufacturer: Smith <br />Smith <br />Piping Diameter: 3" <br />3" <br />Length of Piping Run: 200' <br />200' <br />Product Stored: Diesel <br />Diesel <br />Method and location of Test boot <br />piping -run isolation: <br />Test boot <br />Test boot <br />Test boot <br />Wait time between applying <br />pressure/vacuum/water and 5 min <br />starting test: <br />5 min <br />5 min <br />5 min <br />Test Start Time: 8:55 <br />8:55 <br />Initial Reading (RI): 5 PSI <br />5 PSI <br />Test End Time: 9:25 <br />9:25 <br />Final Reading (RF): 5 PSI <br />5 PSI <br />Test Duration: 30 min <br />30 min <br />30 min <br />30 min <br />Change in Reading (RF -R,): 0 <br />0 <br />Pass/Fail Threshold or 0 drop <br />Criteria: <br />0 drop <br />0 drop <br />0 drop <br />Test Result: % Pass ❑ Fail <br />% Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.