My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1994-2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SAN JOAQUIN
>
345
>
2300 - Underground Storage Tank Program
>
PR0231867
>
COMPLIANCE INFO_1994-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2023 4:42:17 PM
Creation date
6/3/2020 9:53:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1994-2006
RECORD_ID
PR0231867
PE
2361
FACILITY_ID
FA0003959
FACILITY_NAME
AT&T CALIFORNIA - UE042
STREET_NUMBER
345
Direction
N
STREET_NAME
SAN JOAQUIN
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
345 N SAN JOAQUIN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231867_345 N SAN JOAQUIN_1994-2006.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
356
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page_3_of—3- <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑Piping Manufacturer ®Industry Standard Professional Engineer <br /> Other(Specify) <br /> Test Method Used: ®Pressure Vacuum Hydrostatic <br /> Other(Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> Piping Run#Supply Piping Run#Return Piping Run#Vent Piping Run# <br /> Piping Material: POLY POLY POLY <br /> Piping Manufacturer: ROCK GUARD ROCK GUARD A.O. SMITH <br /> Piping Diameter: 3" 3" 3" <br /> Length of Piping Run: APPROX. 10' APPROX. 10' APPROX. 10' <br /> Product Stored: RED DIESEL RED DIESEL RED DIESEL <br /> Method and location of <br /> piping-run isolation: TEST BOOTS TEST BOOTS TEST BOOTS <br /> Wait time between applying <br /> pressure/vacuum/water and 15 MINUTES 15 MINUTES 15 MINUTES <br /> starting test: <br /> Test Start Time: 8:45 A.M. 8:45 A.M. 8:45 A.M. <br /> Initial Reading(Rj): 5 PSI 5 PSI 5 PSI <br /> Test End Time: 9:45 A.M. 9:45 A.M. 9:45 A.M. <br /> Final Reading(RF): 5 PSI 5 PSI 5 PSI <br /> Test Duration: 1 HOUR 1 HOUR 1 HOUR <br /> Change in Reading(RF-R,): 0 PSI 0 PSI 0 PSI <br /> Pass/Fail Threshold or -0 PSI -0 PSI -0 PSI <br /> Criteria: <br /> Test Result: I ® Pass Fail ®Pass Fail Pass Fail Pass Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> *Supply Return and Vent Secondary passed the industry standard recommended pressure test. <br /> No repairs are needed at the present time. <br />
The URL can be used to link to this page
Your browser does not support the video tag.