Laserfiche WebLink
r <br /> SWRCB,January 2002 Page_4_of—4- <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: Sump Manufacturer ®Industry Standard Professional Engineer <br /> Other(Specify) <br /> Test Method Used: Pressure Vacuum ®Hydrostatic <br /> Other(Specify) <br /> Test Equipment Used: INCON TS-STS UNIT Equipment Resolution: N/A <br /> Sump#1052 Sump# Sump# Sump# <br /> Sump Diameter: 38" <br /> Sump Depth: 41" <br /> Sump Material: FIBERGLASS <br /> Height from Tank Top to Top of 16, <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 10" <br /> Electrical Penetration: <br /> Condition of sump prior to testing: GOOD <br /> 2"ABOVE SUMPS <br /> Portion of Sump Testes HIGST <br /> PRODUCT PIPING <br /> PENETRATION <br /> Does turbine shut down when <br /> sump sensor detects liquid(both Yes No ®NA Yes No NA Yes No NA Yes No NA <br /> product and water)?* <br /> Turbine shutdown response time N/A <br /> Is system programmed for fail-safe Yes No U NA Yes No NA Yes No NA Yes No NA <br /> shutdown?{ <br /> Was fail-safe verified to be Yes No ®NA Yes No NA Yes No NA Yes No NA <br /> o erationalf <br /> Wait time between applying <br /> pressure/vacuum/water and starting 15 MINUTES <br /> test: <br /> Test Start Time: 10:45 11:01 <br /> Initial Reading(RI): 5.2639 5.2635 <br /> Test End Time: 11:00 11:16 <br /> Final Reading(RF): 5.2637 5.2635 <br /> Test Duration: 15 MIN 15 MIN <br /> Change in Reading(RF-R,): -.0002 -.0000 <br /> Pass/Fail Threshold or Criteria: .002 .002 <br /> Test Result: 0Pass ' ❑Fail Pass Fail Pass Fail Pass Fail <br /> Was sensor removed for testing? ®Yes No NA Yes No NA Yes No NA Yes No NA <br /> Was sensor properly replaced and ®Yes No NA Yes No NA Yes No NA Yes No NA <br /> verified functional after testing? <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> *Piping Sump passed the industry standard hydrostatic test. No repairs are needed at present time. <br /> If the entire depth of the sump is not tested,specify how much was tested. If the answer to aM of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />