Laserfiche WebLink
09/22/05 11:04 FAX 925 422 2748 EPD / WGNG 191006 <br /> SWRCB,January 2002 FINAL DRAFT Page-S_of 7 <br /> 6. UNDER-DISPENSER C2NTAENYMNT(UDC)TESTING <br /> Does Facility have UDC(s)? OVes—E]No <br /> Test Method Developed By: 0 UDC Manufacturer L]Industry Standard ❑Professional Enghieer <br /> E]Other(Specify) <br /> Test Method Used, El Pressure El vacuum El Hydrostatic <br /> El Other(Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> LiAeV@V <br /> UDC# UDC# # <br /> T5c-i <br /> LJDC <br /> UDC Manufacturer: <br /> UDC Maternal: <br /> UDC Depth: <br /> Height from UDC Bottom to Top <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to <br /> testing: <br /> Rq!q!of UDC Tested;' <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both Elyes❑E]No EINA Elyes O'No[INA Dyes E]No E]NA ®Yes E]No[]NA <br /> product and water)?* - - <br /> Turbine shutdown response time: <br /> Is system programmed for fail- Elyes,L]No EINA E]Yes EINO ONA [--]Yes[:]No EINA OYes E]No,[-INA <br /> safe shutdown?* <br /> Was fail-safe verified to be <br /> al?* E]Yes❑E]No❑EINA ❑E]Yes E:]NoL]NA ❑E]Yes ONoONA [:]YcsONoONA <br /> Wait time between applying <br /> pressure/vacuum./water and <br /> starting test: <br /> Test Start Time: <br /> Initial Reading(Ri): <br /> Test End Time: <br /> Final Reading(RP): <br /> Test Duration: <br /> Change in Reading(RF-&): <br /> Pass/Fail Threshold or Criteria: <br /> Test lteSillt _OPass Pass On ass <br /> Pass <br /> Was sensor removed or disabled <br /> ? OYes E]No EINA E]Yes[:IN E]Yes[]No[:INA E]Yes[:]No[:]NA <br /> for testing- I I <br /> Was sensor properly repiactd and [:] R— [:]NoNA Yes E] OE3No[:INA [-]Yes[:]No DNA <br /> verified functional after testing? Yes No DNA OYes I — I <br /> Comments-(include information on repairs made prior to testing,and recommended follow-up for failed tests.) <br /> No dispenser,this is an Emergency Generator System <br /> If the entire depth of the UDC is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO",then the entire UDC should be tested. (See SWRCB LG-160) <br />