My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FILE 13
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
15999
>
2300 - Underground Storage Tank Program
>
PR0231945
>
COMPLIANCE INFO_FILE 13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2022 4:19:45 PM
Creation date
6/3/2020 9:55:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
FILE 13
RECORD_ID
PR0231945
PE
2361
FACILITY_ID
FA0003934
FACILITY_NAME
Lawrence Livermore National Lab - Site 300
STREET_NUMBER
15999
Direction
W
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
15999 W CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231945_15999 W CORRAL HOLLOW_FILE 13.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
393
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SVV'RCB. January 2002 FINAL DRAFT <br />Comments — (Include information on repairs made prior to testing, and recommended followtup for failed tests.) <br />No dispensers, this is an Emergency Generator System <br />If the entire depth of the UDC is not tested, specify how much was tested. If the answer to M of the questions indicated with an <br />asterisk (*) is "NU', then the entire UDC should be tested. (See SVVRCB LG -160) <br />■i4101"; <br />ink frona"s <br />10�epth of I C Test, <br />Does turbine shut down when <br />UDC sensor detects liquid (both <br />product and water)? <br />nYes nNo rINA <br />OYes ONo EINA <br />Turbine shutdown response time: <br />Fis system programmed for fail- <br />safe shutdown?* <br />E]Yes RNo EJNA <br />E]Yes E]No EINA <br />[3Yes EINo nNA :SO <br />�1 <br />Was fail-safe verified to b <br />oponal?* <br />eratie <br />E]Yes E]No [:INA <br />E]Yes E]No EINA <br />EJYes E]No ONA <br />Wait time between applying <br />I,ressure/vacuum/water and <br />starting test: <br />Test Start Time: <br />i M11 I MIM�.,, <br />Test End Time: <br />Final Reading (RF): <br />Test Duration: <br />Change in Reading LR�RO.fI <br />—Pass/Fail Threshold or Criteria: <br />Was sensor removed or disabled <br />for testing? <br />nYes FINo E]NA <br />RYes []No EINA <br />Was sensor properly replaced and <br />verified functional after testin <br />E]Yes <br />Comments — (Include information on repairs made prior to testing, and recommended followtup for failed tests.) <br />No dispensers, this is an Emergency Generator System <br />If the entire depth of the UDC is not tested, specify how much was tested. If the answer to M of the questions indicated with an <br />asterisk (*) is "NU', then the entire UDC should be tested. (See SVVRCB LG -160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.