Laserfiche WebLink
SVV'RCB. January 2002 FINAL DRAFT <br />Comments — (Include information on repairs made prior to testing, and recommended followtup for failed tests.) <br />No dispensers, this is an Emergency Generator System <br />If the entire depth of the UDC is not tested, specify how much was tested. If the answer to M of the questions indicated with an <br />asterisk (*) is "NU', then the entire UDC should be tested. (See SVVRCB LG -160) <br />■i4101"; <br />ink frona"s <br />10�epth of I C Test, <br />Does turbine shut down when <br />UDC sensor detects liquid (both <br />product and water)? <br />nYes nNo rINA <br />OYes ONo EINA <br />Turbine shutdown response time: <br />Fis system programmed for fail- <br />safe shutdown?* <br />E]Yes RNo EJNA <br />E]Yes E]No EINA <br />[3Yes EINo nNA :SO <br />�1 <br />Was fail-safe verified to b <br />oponal?* <br />eratie <br />E]Yes E]No [:INA <br />E]Yes E]No EINA <br />EJYes E]No ONA <br />Wait time between applying <br />I,ressure/vacuum/water and <br />starting test: <br />Test Start Time: <br />i M11 I MIM�.,, <br />Test End Time: <br />Final Reading (RF): <br />Test Duration: <br />Change in Reading LR�RO.fI <br />—Pass/Fail Threshold or Criteria: <br />Was sensor removed or disabled <br />for testing? <br />nYes FINo E]NA <br />RYes []No EINA <br />Was sensor properly replaced and <br />verified functional after testin <br />E]Yes <br />Comments — (Include information on repairs made prior to testing, and recommended followtup for failed tests.) <br />No dispensers, this is an Emergency Generator System <br />If the entire depth of the UDC is not tested, specify how much was tested. If the answer to M of the questions indicated with an <br />asterisk (*) is "NU', then the entire UDC should be tested. (See SVVRCB LG -160) <br />