My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FILE 5
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
15999
>
2300 - Underground Storage Tank Program
>
PR0231945
>
COMPLIANCE INFO_FILE 5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2022 10:55:40 AM
Creation date
6/3/2020 9:55:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
FILE 5
RECORD_ID
PR0231945
PE
2361
FACILITY_ID
FA0003934
FACILITY_NAME
Lawrence Livermore National Lab - Site 300
STREET_NUMBER
15999
Direction
W
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
15999 W CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231945_15999 W CORRAL HOLLOW_FILE 5.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
367
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCOPE OF WORK <br /> Underground storage tank (UST) 814-D1 U1 adjacent to Building 814 <br /> will be closed by excavation and removal. The site for excavation <br /> will be cordoned off for the protection of other LLNL personnel. Fuel <br /> product lines were flushed back into the tank, and UST 814-D1 U1 <br /> was emptied and decontaminated. Soil above the tank will be <br /> removed and the tank will be excavated. Solid carbon dioxide (dry <br /> ice) will be introduced into the tank to displace oxygen within the <br /> tank. When the oxygen level within the tank is at or below 10%, the <br /> tank will be removed and along with the piping (approximately 40 <br /> linear feet, in two 20-foot lengths) transported as hazardous waste <br /> to a recycler or a disposal facility. If a concrete anchor pad is <br /> present beneath the tank, it will be removed as part of this tank <br /> closure. Soil samples will be collected by LLNL's Environmental <br /> Protection Department (EPD) for laboratory analysis. Soil will be <br /> stockpiled on and covered by polyethylene sheets. The excavation, <br /> trenches and stockpiled soil will be secured with barricades pending <br /> the analysis of the soil samples and subsequent review of the <br /> laboratory results by the LLNL EPD. <br /> -SITE ORGANIZATION <br /> Site Safety Officer (SSO): <br /> Stan Pereira <br /> (LLNL Labor Shop Supervisor) <br /> • Responsible for implementing the project and obtaining any <br /> necessary personnel or supplies to complete the project safely <br /> and in a timely manner. <br /> • Monitors adherence to the SHASP and halts site operations if <br /> the SHASP is being violated or if a hazardous condition arises <br /> at the site. <br /> Contractors (Company) <br /> (Supervisor) <br /> (Workers)_ <br /> (Company)_ <br /> (Supervisor) <br /> (Workers) <br /> D-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.