My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1999-2010
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3250
>
2300 - Underground Storage Tank Program
>
PR0232224
>
COMPLIANCE INFO_1999-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2021 10:42:38 AM
Creation date
6/3/2020 9:56:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1999-2010
RECORD_ID
PR0232224
PE
2361
FACILITY_ID
FA0001877
FACILITY_NAME
AM PM HAMMER/I5 FOOD #83113
STREET_NUMBER
3250
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
08240009
CURRENT_STATUS
01
SITE_LOCATION
3250 W HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232224_3250 W HAMMER_1999-2010.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page 3 . <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: Tank Manufacturer Industry Standard F-1 Professional Engineer <br /> Other (Sped) <br /> Test Method Used: M Pressure ❑ Vacuum ❑ Hydrostatic <br /> Other (Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> MEN= Piping Run# 2 REG Piping Run# 1 REG Piping Run# 3 SUP Piping Run# 1 REG <br /> Piping Material: fiberglass fiberglass fiberglass fiberglass <br /> Piping Manufacturer: smith smith smith smith <br /> Piping Diameter: 311 311 311 311 <br /> Length of Piping Run: 61 10, 121 201 <br /> Product Stored: REGULAR REGULAR SUPREME REGULAR <br /> Method and location of sump sump sump sump <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 5min 5min 5min 5min <br /> starting test: <br /> Test Start Time: 9:38 9:38 9:38 10:59 <br /> Initial Reading(RI ): 3PSI 3PSI 3PSI 3PSI <br /> Test End Time: 10:3 8 10:3 8 10:3 8 11:59 <br /> Final Reading(RF ): 3PSI 3PSI 3PSI 3PSI <br /> Test Duration: 1HR 1HR 1HR 1HR <br /> Change in Reading(RF-RI ): 0 0 0 0 <br /> Pass/Fail Threshold or 0 0 0 0 <br /> Criteria: <br /> Comments- (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.