Laserfiche WebLink
SWRCB,January 2002 Page—of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: X Piping Manufacturer 0 Industry Standard 0 Professional Engineer <br /> 0 Other(Specify) <br /> Test Method Used: X Pressure 0 Vacuum 11 Hydrostatic <br /> 0 Other(Specify) <br /> Test Equipment Used: Pressure Gauge Equipment Resolution:0-15 PSI <br /> Piping Run#I Piping Run 9 Piping Ran# Piping Run# <br /> "Piping Material: Poly <br /> Piping Manufacturer: Total Containment <br /> Piping Diameter: 4�1 <br /> Length of Piping Run' 185' <br /> --Product Stored: Diesel <br /> Method and location of Test boot Test boot Test boot Test boot <br /> pTjp&-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 5 min 5 min 5 min 5 min <br /> starting test:_ <br /> Test Start Time: <br /> im <br /> Initial Reading(R,):Teinst End Time: <br /> Test <br /> Final al Reading(R* I Hour I Hour <br /> Test Duration: I Hour I Hour <br /> Change in Reading 0 <br /> Pass/Fail eshold or 0 drop 0 drop 0 drop 0 drop <br /> Criteria: <br /> Test esuft: 0 Pass x Fail <br /> D Pass 0 Fad 0 Pass 0 Fail 0 Pass 0 Fail <br /> R <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> —Line will not build any pressure <br />