Laserfiche WebLink
Page of <br /> SWRCB,January 2002 i <br /> 6. PIPING TESTING <br /> Test Method Developed By. ❑Sump Manufacturer 1❑Industry Standard X Professional Engineer <br /> ❑Other(specify) <br /> Test Method Used: ❑ ure i❑Vacuum X Hyaroslaurz <br /> ❑Other(SPecrlY) <br /> i <br /> Test Equipment Used. Caldwell Systems i hm on <br /> Equipment Resolution: 005 30 mm <br /> Sump# Sump# <br /> Sump Diameter. 42" <br /> Sump Depth: 55" <br /> Sump Material: Fiberglass <br /> Height from Tank Top to Top of 1 r <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 24" <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Dry <br /> Portion of Sump Tested' 2"above Highest piping penetration <br /> Does turbine shut down when <br /> SUMP sensor detects liquid(both x Yes ❑No ❑NA ❑Yes ❑No DNA ❑Yes ❑No DNA ❑Yes ❑No [INA <br /> product and water)?` <br /> Turbine shutdown response time <br /> Is system programmed for fail-safe x Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No [INA ❑Yes ❑No ❑NA <br /> shutdown? <br /> Was fail-safe verified to be ❑yes x o ❑NA ❑Yes ❑No ❑ ❑Yes ❑No ❑NA ❑Yes 11 No ❑NA <br /> operational? <br /> Wait time between applying <br /> pressure/vacuum/water and starting 5 min 5 min 5 min 5 <br /> test: <br /> Test Start Time: 8:45 <br /> Ar Ar <br /> Initial Reading(Rt): .00" •00,-" <br /> Test End Time: 9:15 <br /> Final Reading(RF): .00 <br /> Test Duration: 30 min 30 min 30 min 30 min <br /> Change in Reading(RF-R j): .00 <br /> Pass/Fail Threshold or Criteria: .005/30 min .005/30 min .005/30 min .005/30 min <br /> Test Result: x Pass ❑Fail ❑ Pass ❑Fail ❑ Pass ❑Fail ❑ Pan ❑Fail <br /> Was sensor removed for testing? x Yes ❑No ❑NA x Yes ❑No ❑NA x Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> Was sensor properly replaced and x Yes ❑No ❑NA xYes ❑No DNA xYes 0 N 0 N ❑Yes 0 N ❑NA <br /> verified functional after!e ? <br /> Comments—(include information on repairs made prior to testing, and recommended fodlaw�up for failed tests) <br /> i <br /> 'if the entire depth of the sump is not tested,specify how much was testrA If the answer to W of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />