Laserfiche WebLink
Page 5 of 8 Orr <br /> 7. UNDER-DISPENSER CONTAINMENT UDC TESTING <br /> Test Method Developed By: ❑UDC Manufacturer ❑Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> UDC# UDC# UDC# UDC# <br /> 7UDanufactu!rer.!!!!terialpth: <br /> Height from UDC Bottom to Top of <br /> Highest Piping Penetration: <br /> Height from UDC Bottom to Lowest <br /> Electrical Penetration: <br /> Condition of UDC prior to testing: <br /> Portion of UDC Tested' <br /> Does turbine shut down when UDC <br /> sensor detects liquid(both product ❑Yes ❑ No ❑ NA ❑Yes ❑ No ❑ NA ❑Yes ❑ No ❑ NA ❑Yes ❑ No ❑ NA <br /> and water)?* <br /> Turbine shutdown response time <br /> Is system programmed for fail-safe ❑Yes ❑ No ❑ NA ❑Yes ❑ No ❑ NA ❑Yes ❑ No ❑ NA ❑Yes ❑ No ❑ NA <br /> shutdown?* <br /> Was fail-safe verified to be ❑Yes ❑ No ❑ NA ❑Yes ❑ No ❑ NA ❑Yes ❑ No ❑ NA ❑Yes ❑ No ❑ NA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and starting <br /> test <br /> Test Start Time: <br /> Initial Reading(Ri): <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: <br /> Change in Reading(RF-Ri): <br /> Pass/Fail Threshold or Criteria: <br /> je 'R Q,Pass ❑Fail' O buss GI'Fail ❑mass U Fail ❑ Pass ❑ Fail <br /> Was sensor removed for testing? ❑Yes ❑ No ❑ NA ❑Yes ❑ No ❑ NA ❑Yes ❑ No ❑ NA ❑Yes ❑ No ❑NA <br /> Was sensor properly replaced after ❑Yes ❑ No ❑ NA ❑Yes ❑ No ❑ NA ❑Yes ❑ No ❑NA ❑Yes ❑ No ❑ NA <br /> testing? <br /> Comments—(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br /> If the entire depth of the UDC is not tested,specify how much was tested. If the answer to a y of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />