My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2009
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3940
>
2300 - Underground Storage Tank Program
>
PR0507837
>
COMPLIANCE INFO_2007-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2024 4:41:40 PM
Creation date
6/3/2020 9:59:00 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2009
RECORD_ID
PR0507837
PE
2361
FACILITY_ID
FA0008057
FACILITY_NAME
TRACY TRUCK AND AUTO STOP
STREET_NUMBER
3940
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95304
APN
21220004
CURRENT_STATUS
01
SITE_LOCATION
3940 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0507837_3940 N TRACY_2007-2009.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 0 <br />a. All valid, current California UST certificates issued by the International Code <br />Council (ICC), that are applicable to the work being performed, and <br />b. A valid, current certificate of training from the manufacturer(s) of the <br />component(s) being tested, repaired, or serviced. <br />and <br />c. Each person installing or testing any component must hold a certificate of training <br />from the manufacturer of that component. <br />4. All components installed must be certified by an independent testing organization <br />and bear the appropriate mark as required by the independent testing <br />organization. <br />5. A tank integrity test must be performed by a certified tank tester on the regular (87) <br />tank after concrete has been poured and results received by this office within 7 days of <br />completion of work. <br />6. Complete and submit a copy of the Underground Storage Tank Certification of <br />Installation/Modification (Former Form C) for the regular (87), premium (91), and <br />Diesel (E) tanks no later than 30 days after work is completed. <br />8. This permit expires 180 days from the approval date. <br />9. Any changes in information and scope of work must be submitted to EHD for approval <br />prior to commencing work. All new addenda supersede the previous ones. <br />Contact Michelle Henry with any questions at (209) 953-7699. <br />Thank vou/7 , <br />REHS <br />od Environmental Health Specialist <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.