My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3940
>
2300 - Underground Storage Tank Program
>
PR0507837
>
COMPLIANCE INFO_2011-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2024 4:52:42 PM
Creation date
6/3/2020 9:59:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011-2015
RECORD_ID
PR0507837
PE
2361
FACILITY_ID
FA0008057
FACILITY_NAME
TRACY TRUCK AND AUTO STOP
STREET_NUMBER
3940
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95304
APN
21220004
CURRENT_STATUS
01
SITE_LOCATION
3940 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0507837_3940 N TRACY_2011-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
517
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tracy Truck & Auto Stop <br />3940 North Tracy Blvd, Tracy <br />SR0061995 <br />5. Contact Thuy Tran at (209) 468-8257 to arrange the following inspection appointments (a 48- <br />hour notice is required for inspection appointments). <br />a. Sensor functionality: Functionality of the monitoring system must be verified to ensure that <br />monitoring has been restored to meet the requirements of Title 23 California Code of <br />Regulations and the Health & Safety Code. Prior to receiving fuel, a complete sensor <br />functionality test of tank and piping monitoring system(s) and demonstration of positive <br />shut down (if applicable). <br />i. Functionality of Veeder-Root 208 liquid detec ion sensor of the AST transition <br />sump and two diesel UST STP sumps 6k <br />b. Verify position placement of sensors: ensure the monitoring equipment is capable of <br />detecting a leak at the earliest possible opportunity. <br />i. Placement position of Veeder-Root 208 liquid detection sensor of the AST <br />transition sump and two diesel UST STP sumps <br />c. Visual inspection of diesel primary and secondary piping to insure proper slope prior to <br />backfill. <br />d. Primary piping soap test: One hour pneumatic pressure test at 110% of operating <br />pressure, or 40 psi, whichever is greater. <br />i. Piping between the diesel AST to the truck side dispensers <br />ii. Piping between the diesel UST to the truck side dispensers <br />iii. Piping between the diesel UST to the auto side dispensers <br />e. Secondary piping soap test: One hour pressure test per manufacturer's guidelines. If there <br />are no manufacturer's guidelines, test shall be performed using an applicable method <br />specified in an industry code or engineering standard. <br />i. Piping between the diesel AST to the truck side dispensers <br />ii. Piping between the diesel UST to the truck side dispensers <br />iii. Piping between the diesel UST to the auto side dispensers <br />iv. Piping between the gasoline UST to the truck side dispensers <br />f. Leak detector test: Leak detector must be tested to confirm that the device can detect a <br />leak of 3 gallons per hour at 10 psi. <br />i. VMI 99 LD -2000 of the diesel 20,000 gallon UST of the auto side <br />ii. VMI 99 LD -3000 of the diesel 20,000 gallon UST <br />iii. FePetro STP-MLD-HCD of the diesel 15,000 gallon AST for the UST piping <br />g. 24-hour hydrostatic test (or equivalent) on transition sump. <br />6. Contact Thuy Tran at (209) 468-8257 to arrange the following optional inspection <br />appointments (a 48-hour notice is required for inspection appointments). <br />a. Sensor functionality and verify position placement of sensors: <br />i. Functionality of Veeder-Root 420 annular sensor of the 10,000 and 15,000 <br />gallon AST and two diesel 20,000 gallon UST annulars'-V6 Out <br />tef <br />ii. Placement position of Veeder-Root 420 annular sensor of ,000 an Va t Ci` VC, <br />15,000 gallon AST <br />b. Overfill prevention verification: Prior to receiving fuel, verify that external audio and visual <br />alarm activates when AST tank is 90% full. <br />Please be aware that the facility cannot operate the UST or UST piping prior to the EHD <br />inspection and approval. <br />
The URL can be used to link to this page
Your browser does not support the video tag.