Laserfiche WebLink
SWRC,B,January 2002 Page 3 <br /> 4k. SECONDARY PIPE TESTING <br /> Test Method Developed By: X❑ Tank Manufacturer ❑ Industry Standard Professional Engineer <br /> Other (Spec) <br /> Test Method Used: ❑X Pressure ❑ Vacuum ❑ Hydrostatic <br /> Other (Specify) <br /> Test Equipment Used:gauge Equipment Resolution: •2 Ops i <br /> Piping Run# 1 SUP SUP Piping Run# 2 UNL REG Piping Run# Piping Run# <br /> "PipingMaterial: dwfiberglass dwfiberglass <br /> Piping Manufacturer: smith smith <br /> Piping Diameter: 311 311 <br /> Length of Piping Run: 1501 150, <br /> Product Stored: SUPREME UNLEADED <br /> Method and location of sump sump <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 5min 5min <br /> starting test: <br /> Test Start Time: 9:30 9:30 <br /> Initial Reading(RI ): 3psi 3psi <br /> Test End Time: 10:30 10:3 0 <br /> Final Reading(RF ): 3psi 3psi <br /> Test Duration: lhr lhr <br /> Change in Reading(RF-R[ ): 0 0 <br /> Pass/Fail Threshold or 0 0 <br /> N <br /> ria: <br /> Comments- (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />