My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0007350
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3775
>
3500 - Local Oversight Program
>
PR0545738
>
ARCHIVED REPORTS_XR0007350
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2020 12:19:29 PM
Creation date
6/8/2020 11:54:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007350
RECORD_ID
PR0545738
PE
3528
FACILITY_ID
FA0003715
FACILITY_NAME
Tracy Blvd Chevron
STREET_NUMBER
3775
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
CURRENT_STATUS
02
SITE_LOCATION
3775 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
249
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• UST Removal and Sampling <br /> Three single-walled fiberglass tanks were removed on November 7, 1995 Two <br /> USTs were 10,000 gallon capacity, and one was 6,000 gallon capacity All USTs <br /> previously contained unleaded gasoline Soil samples T-1 through T-8 were <br /> collected from the sidewalls of the tank excavation at approximately 9 5 feet bgs <br /> Two soil samples, TB-1 and TB-2, were collected at the excavation bottom in <br /> saturated soils at approximately 12 5 feet bgs Analytical results of soil samples <br /> are presented in Table A and soil sample locations are shown on Figure 2 <br /> One grab water sample, TH2O, was collected at approximately 10 feet bgs (Figure <br /> 2) Analytical results of this water sample are summarized in Table C As an <br /> interim remedial measure, 1,500 gallons of groundwater and floating product was <br /> pumped from the former UST excavation This was transported as hazardous <br /> waste under manifest by Erickson Incorporated to Romic Chemical in Palo Alto, <br /> California <br /> Product Line Removal and Sampling <br /> Product piping was removed on November 7, 1995 Soil samples P-1 through <br /> P-9 were collected from beneath the product lines at approximate depths ranging <br />• from 3 5 to 5 feet bgs Sample locations are illustrated on Figure 2 and analytical <br /> results are presented in Table A <br /> Used Oil UST, Sump, and Hoist Removal„and Sampling <br /> A 1,000 gallon capacity single-walled fiberglass used-oil tank was removed on <br /> November 7, 1995 No holes or cracks were observed in the used-oil tank Soil <br /> sample UO was collected from the bottom of the excavation at approximately 9 feet <br /> bgs Sample locations are shown on Figure 2 and analytical results are presented <br /> in Table A <br /> A sump and hoist were uncovered and removed from inside the station building on <br /> November 13, 1995 One soil sample (Sump, HT respectively) was collected from <br /> the base of each excavation at approximately 8 feet bgs Analytical results are <br /> presented in Table A and the sample locations are shown on Figure 2 <br />• <br /> 9-8264tp%m page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.