Laserfiche WebLink
i <br /> r I} II <br /> i <br /> i' <br /> The proposal for extraction of groundwater from the excavation should be <br /> clarified. Water level measurements in the existing wells, both industrial ' <br /> and monitoring wells should be measurejd prior to any groundwater removal for• <br /> the purpose of determining hydraulic connection. <br /> We are enclosing Tri—Regional recommendation guidelines and appendix A for , <br /> your reference in compiling adequate ireparts and workplans for review. <br /> r <br /> Should you have any question regarding this matter contact Diane Hinson <br /> (209) 46B-3450. <br /> Jog i Khanna, M. D. , MPH <br /> Health Off r <br /> Ano <br /> � iS <br /> ^f n asi D rector IC <br /> Environmental Health Division <br /> RV/DSH:ma <br /> Enclosure <br /> cc: RWQCB—Region 5 <br /> Al <br /> DHS—Alt. Tech. <br /> DHS—TSCD <br /> 411 <br /> 3 <br /> i <br />