Laserfiche WebLink
rF <br /> and reporting on detection, assessment and r. lean-up of <br /> underground tank fea1ls It should be noted here that all <br /> excavating, stock piling; of spoil , sampling for possible <br /> tileGTinatic`n and other tec'-nical work done between the dates of <br /> the GT[ report and December , 19S9 were neither performed by nor <br /> witnessed by Hunter & Associates . The work performed and the data <br /> dlscuised herein, collected during the above period, were both <br /> under the direction JTO. Alf <br /> analytical tests run <br /> of the samples collected and the <br /> were of <br /> by Canon ie Environmental <br /> Services (CES) of Stockton, California a C <br /> alifoia <br /> certified laboratory. CES routinely fo! ]ows in-housernQuaIitly <br /> Assurance Guides and keeps Chain-Of-Custody forms for all sample <br /> collecting and testing. All collections of soil samples for <br /> testing, with one exception, were witnessed by representatives of <br /> the Department of Health Services (or its antecedent, the San <br /> Joaquin Local Health District ) . <br /> The documentation presented herein regarding operations during <br /> the period of May 25, 1988 to December I3, 1959 ( the date of the <br /> v,- iters first visit to the Winery Site) were supplied by the aim <br /> Thorpe Oil Company. physical evidence at the 1SC Winery Site of <br /> the excavating operations that took place the field chain-oo <br /> custody forms kept by CES, their lab reports and their field <br /> collection orders , all substantiate that the work done during the <br /> period of May 25, 1988 and December 13, 1989 was done as <br /> discussed herein. Hunter & Associates accept the validity of the <br /> work done during that period by Jim Thorne Oil Company and base <br /> their work herein on that premise. <br /> In telephone discussions with Darlene Reuss DHS <br /> it was informally agreed that this report would cormtence5atl99rle <br /> point of termination of the GTI report . AIs . Reuss also stated <br /> that the Tri -Regional Recorrmendations of July <br /> vised April 3, 1939, 1 , 1988, as re_ <br /> should be the guidelines for report format <br /> and for requirements whenever questions arise. <br /> Neither of the t%vo guidelines used either in the past or <br /> used present]),, those <br /> the TRi -Regional Guidelines and the SJLHD F<eport- <br /> ing Requirements and Format , fit the reports Written, the work <br /> done subsequently and that which will be propose <br /> noted above fit into the SJLHD format of "A Preliminary Report" <br /> and could be inferred to be part of a "Site assessment Report". <br /> This report documents the activities that have occurred since the <br /> GTI Report , assesses these activities and tries to establish a <br /> continuity bet:veen <br /> also the appended docroday's <br /> -_s h o u_l d--f- uments_ and ----- - �� --- <br /> ------------------------ <br /> u-1-fill—the-Tri=Regi-oval ReQuirements as a Soil <br /> tamination Workplan (SC11 ) . Con- <br />