My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TURNPIKE
>
1607
>
3500 - Local Oversight Program
>
PR0545774
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2020 2:34:43 PM
Creation date
6/10/2020 12:12:42 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545774
PE
3526
FACILITY_ID
FA0004998
FACILITY_NAME
COMFORT AIR
STREET_NUMBER
1607
STREET_NAME
TURNPIKE
STREET_TYPE
RD
City
STOCKTON
Zip
95206
CURRENT_STATUS
02
SITE_LOCATION
1607 TURNPIKE RD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
05 June 2008 <br /> AGE-NC Project No. 95-0141 <br /> Page 4 of 8 <br /> laboratory QA/QC reports,and sample chain-of-custody documentation will be presented in a report <br /> with findings and recommendations. Procedures for monitoring well pilot boring drilling and soil <br /> sampling are presented in Section 3.3. <br /> 2.3.2. Well Completion,Development, and Survey <br /> Following well installation, the well will be developed to maximize water flow and minimize the <br /> amount of fine-grained sediment drawn into the well during pumping or bailing.Procedures for well <br /> completion and development are presented in Sections 3.4. and 3.5., respectively. In addition,the <br /> top of the well casing will also be surveyed by a licensed surveyor. <br /> 2.3.3. Ground Water Sample Collection and Analysis <br /> Ground water monitoring and sampling of the newly installed ground water monitoring well will be <br /> conducted on a quarterly basis unless an alternate schedule or suspension of monitoring is approved <br /> by the CVRWQCB. Ground water monitoring activities will include recording of depth to ground <br /> water measurements and collection of ground water samples; ground water sample collection <br /> procedures are described in Section 3.6. Collected ground water samples will be analyzed by a <br /> CDPH-certified laboratory for the constituents listed in Section 2.2. _ <br /> 2.4. REPORT PREPARATION <br /> Upon completion of field work and receipt of final laboratory analysis, a report will be prepared <br /> presenting the findings of the investigation. The report will include a description of the work <br /> performed and results of the sampling and analysis. Conclusions, applicable recommendations, <br /> maps,and cross-sections will be included in the report.The report will be in a format acceptable to <br /> the EHD and CVRWQCB,and will be reviewed and signed by a California Professional Geologist. <br /> 3.0. FIELD PROCEDURES <br /> All field procedures will be overseen by an AGE representative under the supervision of a California <br /> Professional Geologist.Procedures for the advancement of the CPT borings,ground water and soil <br /> sampling, monitoring well completion, equipment decontamination, and sample shipment are <br /> outlined below. <br /> Advanced GeoEnvironmental,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.