My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
2801
>
2900 - Site Mitigation Program
>
PR0009016
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2020 1:55:20 PM
Creation date
6/17/2020 11:34:01 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0009016
PE
2959
FACILITY_ID
FA0004032
FACILITY_NAME
AMERICAN MOULDING & MILLWORK (FRMR)
STREET_NUMBER
2801
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95204
APN
11709001
CURRENT_STATUS
01
SITE_LOCATION
2801 WEST LN
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
423
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> • Gasoline/diesel was detected at approximately 1000 ppm in the <br /> ' shallow (1.5-2.5 feet) soil sample at location P6 in the <br /> maintenance shop ditch. It appears that this elevated <br /> concentration is the results of a leak in the piping of an <br /> ' underground diesel tank. Gasoline/diesel concentrations at the <br /> other locations in the maintenance shop ditch were less than <br /> ' 100 ppm. <br /> ' Based on our assessment of the Phase I data, the following future <br /> actions are recommended: <br /> ' • oily areas within the truck parking/lumber storage areas should <br /> be either: <br /> ' - Excavated to visibly clean soil and backfilled with clean <br /> ' lr fill materials. Contaminated soils should be transported <br /> { �V off-site by a licensed hauler to an approved hazardous waste <br /> � disposal site. <br /> Pv" - Disked to promote biological degradation of the oil and left <br /> i <br /> in place.. <br /> ' - Paved to prevent surface water infiltration. <br /> Future spills in the area should be cleaned up immediately and <br /> properly disposed. <br /> ' • The vertical extent of PCP contamination at location P11 should <br /> be further investigated. As a result, analysis of the 1 to <br /> ' i 2 foot soil sample at locations Pll, P12, and P13 is currently <br /> V being performed. <br /> - 9 <br /> 2611F <br />
The URL can be used to link to this page
Your browser does not support the video tag.