Laserfiche WebLink
is half full of a thick oily sludge Possible from <br /> some cleaning operation <br /> Eric tested soil samples from under pipe using the <br /> thin film chromatography method tested 5 ,000 PPM <br /> CKC moved to east excavation area to start removing <br /> soil overburden while Eric investigates the source <br /> of contamination at the west excavation <br /> Biocell George is at the cell location supervising the AC <br /> repairs <br /> Hay balls arrive 2 PM, bails are to used in the <br /> construction of the cell <br /> Contract Completed the rough draft of CKC's contract Faxed <br /> draft copy to Leo in SFO to follow through with <br /> word processing <br /> Work Day CKC agrees to work 10 hour per day on a straight <br /> time basis This will expedite the work and save <br /> them money Eric and George also agree to working <br /> 10 hour work days so that the fob can be done <br /> quicker <br /> i <br />