June 13 ,1990 <br /> Wednesday <br /> Day # 8 <br /> Safety Eric conducts safety meeting See daily safety <br /> report for items discussed <br /> Water Line Mike Goodwin shows up for CKC Mike will be the <br /> supervisor for this fob I walked Mike and other <br /> personal with CKC to each of the three shut off <br /> valves for the fire water lines I show how the <br /> PIV's work and how they were to proceed in the <br /> event that they broke a water line will excavating <br /> I pointed out that this line was under 125 PSI and <br /> would not take long to fill up the excavated hole <br /> if a line were to brake and that they are to <br /> evacuate the excavation <br /> Siocell Placed hay bails along perimeter forming a 175'x <br /> 205' containment area for the contaminated soil to <br /> be placed. <br /> Drinking Hot weather has placed a demand on the drinking <br /> Water water Located a cooled water fountain outside on <br /> the east wall of building 40 This can be used by <br /> the people working at the biocell area located a <br /> water cooler inside building 5 This is a bottled <br /> water machine and can be used by people working at <br /> the excavation Contacted Polar Water Company, <br /> supplier of the bottles and requested that they <br /> deliver an additional 9 five gallon bottles to the <br /> job site <br /> Visitors Mr Sloop and Mr Kirkpatrick of AM&M were on site <br /> observing the work They wanted to know if we had <br /> hit contaminated soil <br /> Des Asked Mr Palmer of AM&M if two fiat bed truck <br /> trailers could be move from the front of were the <br /> drums are being stored trailers were moved by the <br /> end of the work day <br />