Laserfiche WebLink
June 29 ,1990 <br /> Friday <br /> Day # 20 <br /> Backfill CKC continues the backfilling operation Uses a box <br /> scraper to cut down the original building pad Pad <br /> needed to be trimmed down for placement of base <br />' rock <br /> Mr Trucker unable to deliver material fast enough <br /> to keep backfilling and compaction work moving <br /> Delay was do to accident on highway 4 had closed <br />' the road to the quarry <br /> I shut the job down at 1 30 and sent CKC home <br /> Materials would continued to be delivered the rest <br /> of today and continue on monday until all fill <br /> material required is on site <br /> Biocell Watered cell for one hour <br /> Jeff Bold of SAC office showed up at 1 30 To take <br /> soil samples <br /> Fence Economy fence picked up fence panels Panel clamps <br /> were missing They will bill for missing clamps <br />' Pavement Edge Pavement edge is not well defined Edge butts dirt <br /> and decomposed AC pavement <br /> Marvin Palmer reviewed the pavement edge with me <br /> Agreed to feather the edge along the front of <br /> Yankee Stadium This area is subject to much truck <br /> and car traffic <br /> Marvin Palmer wanted to know why we were paving, <br />' why not just base and oil Give money to AM&K <br /> instead <br /> Called Bruce, said that the area had to paved so <br /> that the site had a cap on it a requirement of the <br /> regulating agency <br /> Drainage <br />