Laserfiche WebLink
July 2,1990 <br /> Monday <br /> Day # 21 <br /> Backfill Backfilling continued Materials from MR Trucker <br /> were delayed, no materials delivered until 10 30 <br /> CKC used materials delivered on friday after they <br /> had gone home Jim said that Mr Trucker was not <br /> able to deliver passed 4 PM because of gate being <br /> locked <br />' Storm Drains CKC instructed to install catch basins and drain <br /> pipe along the North edge of the excavation This <br /> would restore the drainage and provide for new <br /> pavement drainage <br /> Told them to work up price for this work and that <br /> this would be an extra <br />' Compaction AIM showed up 10 30 AM <br /> Testing Not ready for any tests Told them to return <br /> tomorrow after lunch <br /> Biocell Watered the cell for one hour early AM <br /> Jim Curtis on site about 3 PM to do work at cell <br />' Jim requested that I not water the cell tomorrow <br /> He was going to have a contractor till the soil and <br /> wanted to have it dry <br /> 1 <br />