Laserfiche WebLink
Mr. Arnold Hof -2 - 31 October 2001 <br /> viable remedial technologies for sites such as yours with shallow groundwater and primarily <br /> nitrate constituents. <br /> • We agreed that it would not be necessary to prepare a feasibility study for this site, since the <br /> remedial technology is acceptable and the alternatives for groundwater treatment are limited at <br /> the site. <br /> • We requested that you replace MW-6 that was located south of your property and was <br /> destroyed during weed abatement activities. You offered to relocate MW-6 along the <br /> southern boundary of your property. We agreed that that would be satisfactory. <br /> • Ms. Cohen introduced our cost recovery and billing system. We are sending you our <br /> acknowlegement form and documentation under separate cover. <br /> Please provide a report of the fall monitoring well results by 28 December 2001. This report <br /> should include a work plan and schedule for replacing MW-6. <br /> Thank you for pursuing remediation on this site. We look forward to working with you. If you <br /> have y ques ons or omments, you may contact me at (916) 255-3080. <br /> 1 <br /> AMY RRELL <br /> Private Sites Cleanup Unit <br /> cc: Mr. Mike Infuma, San Joaquin County Public Health Services, Stockton <br /> Mr. Jim Wallace, Environmental Consulting Services, Fair Oaks <br />