My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2040
>
2900 - Site Mitigation Program
>
PR0506560
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2020 8:27:10 AM
Creation date
6/22/2020 8:11:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0506560
PE
2960
FACILITY_ID
FA0004535
FACILITY_NAME
CAL-FARM SUPPLY
STREET_NUMBER
2040
Direction
W
STREET_NAME
WASHINGTON
City
STOCKTON
Zip
95206
APN
14503004
CURRENT_STATUS
01
SITE_LOCATION
2040 W WASHINGTON
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cal Farm Supply, Stockton • • - 2 - <br /> enclosed <br /> 2 -enclosed for your review. Please provide a site map and any comments by 30 October 1997. The <br /> monitoring event referenced in the workplan is to follow the requirements listed in the draft MRP. <br /> The first quarterly monitoring event is to be conducted during the fourth quarter 1997 (between <br /> October and December) and the quarterly monitoring report is due no later than 30 January 1998. <br /> 8. The four existing monitoring wells were sampled in April 1997. Samples were submitted to the <br /> Board's laboratory for analysis and the results sent to your consultant in May. The results should <br /> have been included in this report. <br /> 9. A report of results is to be submitted by 30 December 1997 and is to include (a)the results of the <br /> well installation, development, and surveying, (b) a tabulation of all the groundwater data collected <br /> to date, including the two monitoring events conducted by the Board, (c) a tabulation and graphical <br /> depiction of the groundwater gradient and flow direction during the April 1997 monitoring event, <br /> and(d)the remedial options feasibility study as approved in the 28 February 1997 workplan. <br /> I am dismayed that it took Cal Farm Supply five months to submit the results of the April field work and <br /> trust that future reports will be submitted in a timely manner. I look forward to receiving the site map <br /> and comments about the draft MRP by 30 October 1997,the report of results/remedial options <br /> feasibility study by 30 December 1997, and the fourth quarter 1997 monitoring report by 30 January <br /> 1998. <br /> If you have any questions, I can be reached at(916) 255-3078. <br /> vi EAdq ��Ojo <br /> WENDY WYELS <br /> Site Cleanup Unit <br /> Enclosure <br /> cc w/enc.: Mr. Mike Infurna, San Joaquin County Public Health, Stockton <br /> Ms. Sandra Pezzillo, IT Corporation,Mather <br /> Ms. Martha Bowman, Trustee, Penryn <br /> �LGLGGi: <br />
The URL can be used to link to this page
Your browser does not support the video tag.