My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEBER
>
0
>
2900 - Site Mitigation Program
>
PR0515450
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2020 6:26:41 PM
Creation date
6/23/2020 3:50:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0515450
PE
2960
FACILITY_ID
FA0012153
FACILITY_NAME
SOUTH SHORE PARCEL
STREET_NUMBER
0
STREET_NAME
WEBER
STREET_TYPE
AVE
City
STOCKTON
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
WEBER AVE
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECOR w Secorcom <br /> INTERNATIONAL <br /> S E C O R INCORPORATED 3017 Kilgore Road,Suite 100 <br /> Sacramento,CA 95670 <br /> 916-861-0400 TEL <br /> 916-861-0430 Fm <br /> February 2, 2004 VV E 10 <br /> Ms. Devra Lewis FEB 0 5 2004 <br /> Central Valley Regional Water Quality Control Board ENVIRONMENT HEALTH <br /> 11020 Sun Center Drive, #200 <br /> Rancho Cordova, California 95670 PERMIT/SERVICES <br /> RE: Interim Remedial Action Plan (IRAP) <br /> L&M Operable Unit <br /> Stockton Parcel 2A <br /> West Weber Avenue and North Lincoln Street <br /> Stockton, California <br /> SECOR Project Nos.: 77CP.60415.04.0001, 77CH.26397.05.0330 <br /> 77CH.21321.05.0330 <br /> Dear Ms. Lewis: <br /> This letter, prepared by SECOR International Incorporated (SECOR) on behalf of the L&M Operable <br /> Unit Group, relates to the Interim Remedial Action Plan (IRAP) for the site referenced above. In this <br /> letter, SECOR will report on the operational status of the interim dual phase extraction (DPE) system <br /> that was fully installed at the site by December 2003. <br /> The IRAP was submitted to the Central Valley Regional Water Quality Control Board (RWQCB) on <br /> July 16, 2003 and was approved, with certain contingencies, as described in the letter dated July 24, <br /> 2003 from Wendy Cohen to Robert Cochran of the Chevron Environmental Management Company. <br /> Ms. Cohen's letter required that the L&M Operable Unit Group submit a system installation report <br /> and a status summary of the first month of operation of the DPE system by December 5, 2003. A <br /> system installation report was submitted on December 5, 2003. <br /> On November 14, 2003, SECOR, on behalf of the L&M Operable Unit Group, notified the <br /> CVRWQCB that due to delays in obtaining a building permit from the City of Stockton and power <br /> from PG&E, SECOR would not be able to provide a status summary of the first month of operation of <br /> the DPE system by the December 5, 2003 deadline.' SECOR requested, and the RWQCB granted <br /> an extension of time until February 13, 2004 for submission of the status summary of the first month <br /> of operation of the DPE system. As described in greater detail below, continued delays in providing <br /> power by PG&E and a new issue related to the permit from the San Joaquin Valley Air Pollution <br /> Control District (SJVAPCD) required SECOR, on behalf of the L&M Operable Unit Group, to seek a <br /> further extension of the deadline for submission of the status summary of the first month of operation <br /> of the DPE system. <br /> On June 16, 2003, SECOR submitted an application to PG&E so that power would be available to <br /> the DPE system once it was installed. After the application was submitted, PG&E planned the power <br /> service for the site. This planning period took approximately sixteen (16) weeks, and on October 27, <br /> 2003, PG&E informed SECOR that it would not be able to provide power to the DPE system until <br /> approximately six (6) to eight (8) weeks after the system had been installed, which would have been <br /> approximately January 5, 2004. However, despite repeated requests to PG&E, power has still not <br /> been delivered to the site. <br /> ' SECOR subsequently obtained a building permit from the City of Stockton, and construction activities at the site were <br /> completed in December 2003. <br /> IAConocoPhillips\Tosco Marketing\0415 Stockton Parcel 2A\misc letteAlRAPLtr.doo <br />
The URL can be used to link to this page
Your browser does not support the video tag.