Laserfiche WebLink
(, D. Alternate const on for new underground storage tanks canta�g motor vehicles fuel [Section 26331. <br /> (1) Monitoring and response plan [Section 26341. <br /> (2) Underground storage tank composed of.... <br /> (a) Fiberglass reinforced plastic. <br /> (b) Cathodically protected steel. <br /> (c) Steel clad with fiberglass reinforced plastic. <br /> a (d) Other material that complies with section 2631 and 2632. <br /> (3) Floor of leak interception and detection system constructed on a firm base and sloped to a <br /> collection sump (use of membrane Liners comply with section 2631 (d) (6) requirements.) <br /> (4) Access casings installed in the collection sump of the secondary containment system with <br /> backfill in the interstitial space. The access casing shall meet all of the following: <br /> Designed and installed to allow the liquid to flow into the casing. <br /> Sized to allow removal of collected Liquid and able to withstand all anticipated applied <br /> stresses. <br /> Constructed of material that will not be structurally weakened. <br /> Screened along entire vertical zone of permeable material. <br /> Capable of preventing leakage of any hazardous substance from the casing. <br /> _ Extend to the ground surface and covered with a locked waterproof cap. <br /> Capable of meeting S.J. Co. PHS-EHD Well Standards. <br /> Leak interception and detection system shall prevent the leaked hazardous substance from <br /> entering ground water. <br /> 14. INTERSTITIAL SPACE MONITORING <br /> A. Visual monitoring [Section 2632 (c) (1)1 <br /> (a) Exterior surface and floor beneath tank monitored by'direct viewing <br /> (b) Daily visual inspections <br /> (c) Liquid level in tank to be recorded at time: of inspection <br /> (d) If liquid observed around or beneath primary tank, owner will determine if an unauthorized release <br /> has occurred. <br /> S. Mechanical or electronic monitoring [Section 2632 (c) (2)1 <br /> X (a) Continuous monitoring system connected to an audible and visual alarm system. <br /> Monitoring equipment to be installed <br /> aC Manufacturer: Ti.-W <br /> et Model Number: Et°iGJ 3=JC�'D <br /> oC Sensor Type: _ Vapor 0( Liquid _ Both. <br /> __&& Sensor/Panel specifications. <br /> _ CQ_ Location(s) for sensors: <br /> Tank: of Piping: eS /_ 41 <br /> , <br /> Dispenser: —S f._�2 .( <br /> C. Monitoring and response plan submitted [Section 2632 (d) (1) & (2)1. <br /> 15. Any special accessories, fittings, coatings, or linings not inherent within the initial design of the 10 tank or <br /> double-wall UST. [Section 2631 (b)] <br /> A. Approved by a nationally recognized independent testing organization. <br /> B. Demonstration of integrity with the primary and/or secondary containment. <br /> 6 <br />