Laserfiche WebLink
0 ec &I <br />Page 4 of 9 <br />5. SECONDARY PIPE TESTING <br />Test Method Developed By: ❑ Piping Manufacturer ® Industry Standard ❑ Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: ® Pressure ❑ Vacuum ❑ Hydrostatic <br />❑ Other (Specify) <br />Test Equipment Used: Pressure Gauge <br />Equipment Resolution: 0-30 psi <br />Piping Run # 87 SYPPiping <br />Vent <br />Run # 91 <br />Vent <br />Piping Run # Vapor <br />Return <br />Piping Run # <br />Piping Material: <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Piping Manufacturer: <br />AO Smith <br />AO Smith <br />AO Smith <br />Piping Diameter: <br />3 in <br />3 in <br />3 in <br />Length of Piping Run: <br />60 feet <br />50 feet <br />127 feet <br />Product Stored: <br />Vapor <br />Vapor <br />Vapor <br />Method and location of <br />piping -run isolation: <br />87 SYP Sump -Vent <br />91 Sump -Vent <br />Sumps - <br />Dispensers <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />5 min <br />5 min <br />5 min <br />Test Start Time: <br />10:35 AM <br />10:35 AM <br />10:35 AM <br />Initial Reading (R,): <br />5 psi <br />5 psi <br />5 psi <br />Test End Time: <br />11:35 AM <br />11:35 AM <br />11:35 AM <br />Final Reading (RF): <br />5 psi <br />5 psi <br />5 psi <br />Test Duration: <br />60 min <br />60 min <br />60 min <br />Change in Reading (RF-Rj): <br />0 <br />0 <br />0 <br />Pass/Fail Threshold or <br />Criteria: <br />5 psi <br />5 psi <br />5 psi <br />Test Result: <br />Z Pass ❑ Fail <br />® Pass ❑ Fail <br />® Pass; ❑ Fail <br />❑ Pass ❑ Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-iip for failed tests) <br />