Laserfiche WebLink
0 ecov/ <br />Page 6 of 9 <br />Test Method Developed By: ❑ UDC Manufacturer ® Industry Standard ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: ❑ Pressure ❑ Vacuum ® Hydrostatic <br />❑ Other (Specify) <br />Test Equipment Used: Level Change Indicator <br />Equipment Resolution: 0.0025 <br />UDC # 1-2 <br />UDC # 3-4 <br />UDC # 5-6 <br />UDC # <br />UDC Manufacturer: <br />Unknown <br />Unknown <br />Unknown <br />UDC Material: <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />UDC Depth: <br />30 in <br />30 in <br />30 in <br />Height from UDC Bottom to Top <br />of Highest Piping Penetration: <br />12 in <br />12 in <br />12 in <br />Height from UDC Bottom to <br />Lowest Electrical Penetration: <br />5 in <br />5 in <br />5 in <br />Condition of UDC prior to <br />testing: <br />Dry <br />Dry <br />Dry <br />Portion of UDC Tested' <br />2" above prod. piping <br />2" above prod. piping <br />2" above prod. piping <br />Does turbine shut down when <br />UDC sensor detects liquid (both <br />product and water)?" <br />❑Yes [-]No ®NA <br />❑Yes ❑No ®NA <br />❑Yes ❑No ®NA <br />Turbine shutdown response time <br />See comments <br />See comments <br />See comments <br />Is system programmed for fail- <br />safe shutdown?. <br />❑Yes ❑No ®NA <br />❑Yes ❑No ®NA <br />❑Yes ❑No ®NA <br />Was fail-safe verified to be <br />operational? <br />❑1 es ❑No ®NA <br />❑Yes ❑No ®NA <br />❑Yes ❑No ®NA <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test <br />5 min <br />5 min <br />5 min <br />Test Start Time: <br />10:05 AM <br />10:05 AM <br />10:05 A <br />Initial Reading (Ri): <br />0 <br />0 <br />0 <br />Test End Time: <br />10:35 AM <br />10:35 AM <br />10:35 AM <br />Final Reading (RF): <br />0 <br />0 <br />0 <br />Test Duration: <br />30 min <br />30 min <br />30 min <br />Change in Reading (RF -R,): <br />0 <br />0 <br />0 <br />Pass/Fail Threshold or Criteria: <br />0.0025 <br />0.0025 <br />0.0025 <br />Test Result: <br />N Pass ❑ Fail <br />® Pass" ❑ Fail <br />0 Pass ❑ Fail <br />❑ Pass ❑ Fail <br />Was sensor removed for testing? <br />®Yes [-]No❑NA <br />®Yes ❑No ❑NA <br />®Yes ❑No ❑NA <br />❑Yes ❑No ❑NA <br />Was sensor properly replaced and <br />verified functional after testing? <br />®yes ❑No ❑NA <br />®Yes ❑No ❑NA <br />❑Yes ❑No [:INA❑Yes <br />❑No ❑NA <br />Comments — (include information on repairs made prior to testing, and recommended follow-up,for failed tests) <br />UDC sensor(s) were tested separately as part of the annual monitor certification test. <br />If the entire depth of the UDC is not tested, specify how much was tested. If the answer to aM of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG -160) <br />