Laserfiche WebLink
SWRCB,January 2002 Page of <br /> 5.. SECONDARY PIPE TESTING <br /> Test Method Developed By: X Piping Manufacturer X Industry Standard Professional Engineer <br /> Other(Specify) <br /> Test Method Used: X Pressure Vacuum Hydrostatic <br /> Other(Specify) <br /> Test Equipment Used:Pressure Gauges Equipment Resolution: <br /> Piping Run#S Piping Run#6 Piping Run# Piping Run# <br /> Piping Material: <br /> Piping Manufacturer: <br /> Piping Diameter: <br /> Length of Piping Run: 3 ® slap <br /> Product Stored: lie it , �• <br /> Method and location of <br /> piping-run isolation: $rP 5 ue <br /> Wait time between applying <br /> pressure/vacuum/water and , *®'A/ 16-M/Al . <br /> starting test: 1A 11,2- <br /> Test <br /> zTest Start Time: 1 ;'00 Aw Aw <br /> Initial Reading(Rj): S P,5. . 5 P SZ, <br /> Test End Time: 1 '0 4#7 1o <br /> Final Reading(RF): E. P•5 .T G? P.5°I <br /> Test Duration: <br /> Change in Reading(RF-Rj): <br /> Pass/Fail Threshold or <br /> Criteria: ° <br /> TeStiResull: :+ sr <br /> T 1EA"as Pail, <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> r—T <br /> � ZZI hwjaef r ®bhkkt FAew/,V- <br /> 0 R d� '� <br />