My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JACKSON
>
2501
>
2300 - Underground Storage Tank Program
>
PR0231488
>
COMPLIANCE INFO_2013-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2021 12:06:22 PM
Creation date
6/23/2020 6:49:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2018
RECORD_ID
PR0231488
PE
2361
FACILITY_ID
FA0003910
FACILITY_NAME
H&M - BW #98
STREET_NUMBER
2501
STREET_NAME
JACKSON
STREET_TYPE
AVE
City
ESCALON
Zip
95320
CURRENT_STATUS
01
SITE_LOCATION
2501 JACKSON AVE
P_LOCATION
06
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231488_2501 JACKSON_2013-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
516
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L1 <br />R E <br />SAN JOAQUIN COUNTY DEC 0 7 2016 <br />ENVIRONMENTAL HEALTH DEPARTMENT <br />1868 East Hazelton Avenue, Stockton, CA 95205-6232 <br />Telephone (209) 468-3420 Fax (209) 464-0138 ENVIRONMENTAL HEALTH <br />www.sjcehd.com DE PARTMENT <br />iiiiii���ililill 11��11 1111 11111111 <br />PERMIT REQUIRED: An approved EHD permit is required before the start of the following work: <br />1. UST system installations or expansions <br />2. UST closure <br />3. UST tank lining or repair <br />4. All piping repairs downstream of the shear valve <br />5. Secondary containment repairs including piping, sumps, tanks <br />6. Conversion frame install during dispenser replacement <br />7. VPH sensor communication repair <br />8. Direct bury spill container replacement <br />9. Mechanical flapper valve overfill prevention install or replacement <br />An approved EHD permit is required but repairs can be done prior to permit approval: <br />1. All monitoring equipment or overfill prevention equipment installation which Is not a like -for -like <br />replacement <br />NO PERMIT REQUIRED* (EHD Notification required) -"LIKE FOR LIKE" <br />replacements only for work that greviously required an EHDpermit- <br />See the mandatory conditions on following page: <br />1. Shear valves connected to Bravo float& chain devices <br />2. Bravo float & chain repairs <br />3. Turbine or dispenser relay switch for positive shutdown <br />4. Cold start or replacement of monitoring panel <br />5. Spill containers in tank top sumps <br />6. Liquid sensor <br />7. Leak detector <br />8. External audio/visual alarm for overfill prevention <br />9. Dispenser replacement /repair except when conversion frames are required <br />10. Tank gauge (ATG) replacement when used for overfill prevention <br />1112111111- <br />11111119111111111 <br />reciuired an EHD permit - <br />!Y" -A <br />1. Breaking concrete over tank system, as long as secondary containment testing is done immediately <br />following concrete work. <br />2. Monitoring panel circuit board or software upgrade. <br />1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.