My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1985-2007
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DE VRIES
>
13850
>
2300 - Underground Storage Tank Program
>
PR0231547
>
COMPLIANCE INFO_1985-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2023 2:12:37 PM
Creation date
6/23/2020 6:49:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1985-2007
RECORD_ID
PR0231547
PE
2361
FACILITY_ID
FA0003848
FACILITY_NAME
Verizon Business: KINGCA
STREET_NUMBER
13850
Direction
N
STREET_NAME
DE VRIES
STREET_TYPE
RD
City
LODI
Zip
95240
APN
05524018
CURRENT_STATUS
01
SITE_LOCATION
13850 N DE VRIES RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231547_13850 N DE VRIES_1985-2007.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
401
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cot 16 07 07:19p Sheila Wallace 9256897921 p.9 <br />2.3.37 The Conduit from the Pneumercalor TMS -2000 panel, in the shelter to the point <br />it enters the ground shall be 1 inch rigid steel conduit A t" rigid seal -off shall <br />be installed on the conduit as the first fitting as the conduit enters the building. <br />All below grade conduit shall be SCH 80-1"!electrical PVC. <br />2.3.38 Wire conductors from the Pneumercator panel to the Turbine shall be 5 pairs of <br />Belden 8441, 22 gauge stranded, braid shielded w/ drain wire, PVC jacketed. <br />2.3.39 Wire conductors from the Pneumercator panel to the existing Hoffman Box <br />Alarm Panel in the shelter shall be a six pair, 22 gauge solid, PVC jacketed, <br />Belden 8743. <br />2.3.40 Wire conductors from the Pnerrruercator panel to the Pneumercator external <br />alar, P/N RA -200 shall be 3 conductor, 22 gauge str=hxL PVC jacketed, <br />Belden 8443. <br />2.3.41 All wire connections below grade within the turbine junction box shall be made <br />using 3M Sootchlok 314 connectors, 3M epoxy seal -pack or approved <br />equivalent Note: Wiring splices will not be permitted other than to attach to <br />tin monitoring components within the junction box <br />2,4 Diel Monitoring System Upgrade <br />2.4.1 The existing EBW AutoStik 950 and all related components shall be removal. <br />Portions of the existing conduit my or may not be able to be reused. <br />2.4.2 A new TMS 2000 Pneumercator panel shall be furnished by VERIZON and <br />installed by the Contractor. Refer to Section 6.0 for VERIZUN furnished <br />equipment The Exterior Over fill Annunciator shall be mounted on the exterior <br />of the generator shelter bmg the UST at approximately 7'-0" above finished <br />grade. <br />2.4.3 Termination of wiring and programming of the TMS -2000 Pneumerratar shall <br />be performed by a Certified Pneumercator Installer. The mounting of the unit <br />and all attachments shall be made by this Contractor. Any alteration to the <br />TMS -2000 Pneumercator unit will void the maim 's wamway and the <br />entire unit shall be replaced at the Contractor's expense. <br />2.4.4 ImtalWon of this tacit includes atl related components, conduit, wiring and <br />fasteners. Contractor shall be responsible for installing all new conduits in the <br />shelter and no flex conduit is permissible. Installation of flex conduit requires <br />VERIZON approval. in writing from supervisor level. <br />2.4.5 There are 4 alarms that shall report to the Alarm Hoffman Box in the gememor <br />shelter: Hi Fuel @90%, Low Fuel @5001e, Water in the Fuel @2 inches and <br />Environmental. The Environmental Alarm will consist of 2 different sensors: <br />turbine enclosure and tante interstitial. These 4 alarm points are monitored by <br />VERIZON National Surveillance 24 hours a clay, 365 days a year. Some of the <br />existing conduit may be ; Contractor is to make allowance in his bid to <br />replace conduit as requked to complete the project. The Contractor will be <br />required M pull new wiring from the Pneumercator panel to the Hoffman Alarm <br />Panel. The Contractor will tie the alarm wiring down in the Fn for and <br />label the wiring in the Alarm Panel. Termination to the Hoiiiman alarm panel <br />will be by VER1ZON personnel, unless the termination points have been <br />identified. <br />2.4.6 The exterior Over -fill annunciator shall be tied to the Over -fill contact only. <br />
The URL can be used to link to this page
Your browser does not support the video tag.