Laserfiche WebLink
Oct 16 07 07:19p Sheila Wallace 9256897921 p.8 <br />0 0 <br />2.4.7 Pncumercator installation documentation shall be filled out entirely and <br />submitted for warranty purposes. Copies shall be included in <br />Upgraddhwtallation Documentation. <br />2.5 T & Documentation <br />2.5.1 The primary and secondary fuel line piping, supply and return shall be tested <br />during constructim The primary piping shag be tested @ 50 psi for a period of <br />I how. The secondary piping shall be tested @ 3 psi for a period of I hour. <br />Dmumentation forms will be provided by VERIZON. <br />2.5.2 IU pdMary and secondary vent line piping shall be tested during construction. <br />The prhnaiy piping shall be tested @ 50 psi for a period of I hour. The <br />secondary piping shall be tested @ 3 psi for a period of I hour. Documentation <br />forms will be provided by VERIZON. <br />2.5.3 The 4 inch Environ conduit at the fuel and vent lines shall be tested during <br />construction. The conduit piping shall be tested @ 3 psi for a period of 1 how. <br />Documentation forms will be provided by VERIZON. <br />2.5.4 After all penetrations have been installed into the turbine during construction, a <br />hydrostatic waw tea shall be performed. The water level shall be stable at a <br />point above all peneftafion into the turbine and remain at that levet for a period <br />of no less than 12 hours Documentation forms will be provided by VE N. <br />2.5.5 While the excavation is still open, the interstitia! area on the exiisting UST shall <br />be tested @ 5 psi for a period not less that I hour. Documentation forms will be <br />provided by VERIZON. <br />2.5.6 At the conclusion Of the project, the Contractor shall provide the stale required <br />SB 989 test. The Contractor performing the test sbalt be certified with the State <br />of California. The Contiactor shall be responsible for docn submittals <br />to the State of Califorma. The Contractor shall also fax a duplicate copy of all <br />documenCation submitted to the State of California to Todd Harris, the <br />environmental U= Waft for VERIZON, Enviromcntal-Salety Compliance <br />DepadmenL Todd's office number is 972-729-5671 and his fax is 972-729- <br />5870. Copies of this document Shan also be included in the UST <br />upgrade/hwallation Documentation Form <br />2.5.7 At the conclusion of the project, the Contractor shaft complete the State <br />Certification on, the fuel monitoring system, as required by the State of <br />California. PM Contractor shall be respom-ble for dommnutation submittals to <br />the State of California. The Contractor shall also fax a duplicate copy of all <br />documentation submitted to the State of California to Todd Hams, the <br />environmental team leader for VERIZON, Environmental -Safety Compliance <br />Department. Todd's office number is 972-729-5671 and his fax is 972-729- <br />5870. Copies of this document "I also be included In the UST <br />upga&Anstaltation Documentation Form. <br />2.3.3 Any soils removed from the facility that were removed from the excavation of <br />the UST, related vent or fuel Imes, shall have dwinientation regarding the <br />amount of soil and destination. All wage materials shall be propedy and legally <br />disposed of Documentafion, forms will be provided by VERIZON. Copies of <br />this document shall also be included in the UST Upgraddhistallation <br />Doc umentatko Form. <br />2.5.9 Any waste diesel feet removed from the facility shall have documentation <br />regarding the amount of fuel and destination. Alt waste materials shall be <br />properly and legally disposed of. Documentation forms will be provided by <br />