Laserfiche WebLink
Oct 16 07 07:19p Sheila Wallace 9256897921 p.7 <br />0 0 <br />VERIZON Copies of this document shall also be included in the UST <br />Upgraddinstallation Documentation Form. <br />2.5.10 At the conclusion of the project, the VERIZON Field Engineer and the <br />Contractor's representative shall jointly complete the VERIZON UST Upgrade <br />Completion ChoclWst. This signed document shall be included in the UST <br />Upgrade/Installation Documentation Foran. <br />2.5.11 UST Upgradeftstallation Documentation — Contractor shall submit draft report <br />to Robert Milian, Verizon UST Supervisor, for review/comment within 30 days <br />of project completion. Once corrections have been incorporated six (6) copies <br />shall be submitted back to Robert Mahart. This document shall contain the <br />following information: <br />A. Site location map. <br />B. A list and copies of all correspondences, permits and notifications <br />relevant to this project - <br />C. A daily tog of conshuction actives through out the duration of the <br />project. This item shall also list all personnel on site each day and <br />atl materials delivered to the project. <br />D. A minimum, of 12 pictures depicting the major junctures of the <br />UST Upgrade. <br />E. Copies of all test documentation and m=Wfilcl disposal <br />req=W within the text of the Statement of Work. <br />F Pacumercator manuals, product information aid installation forms. <br />G. Product information shall be included on Environ piping and all <br />associated construction materials. <br />H. As-biiilt drawings <br />2.5.12 Change Orders — AD Change Orders related to the general construction of a <br />VERIZON project shalt be filled ont completely and approved by the prrject <br />consavaton supervisor before any work shall proceed. All Change Order shall <br />be generator by the VERIZON Field Engin= and email to the primary <br />consM=on Contractor The primary construction Contractor shall complete the <br />document and submit to the VERIZON supervisor for approval, via email or fax. <br />After the Change Order has been fidly approved, the Conu=W shall then <br />proceed with the additional work <br />The following documents are to be pan of this SOW: <br />A: Statement of Work <br />B: VERIZON UST Drawings & Specifications <br />