Laserfiche WebLink
C 11K T.R S -T HR <br />DlL It <br />"., H <br />75&SICtow= <br />MW 6113 1Y.11 t1rd W I ' <br />Page 3 <br />Test Method Developed By: <br />j Piping Manufacturer X Industry Standard :Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: <br />X Pressure <br />% Other (Sped) <br />Vacuum -' Hydrostatic <br />Test Equipment Used: <br />I Equipment Resolution: <br />FOS <br />FOR <br />Vent <br />Piping Material: <br />Flexible <br />Flexible <br />Flexible <br />Piping Manufacturer: <br />Flexible <br />Flexible <br />Flexible <br />Piping Diameter: <br />W9 <br />1" <br />1 '/� " <br />Length of Piping Run: <br />-10' <br />-10' <br />-5' <br />Product Stored: <br />Diesel <br />Diesel <br />Diesel <br />Method and location of <br />i in -run isolation: <br />Test Coupling <br />Test Coupling <br />Test Coupling <br />Wait time between applying <br />pressure/vacuum/water and <br />test: <br />5 min <br />5 min <br />5 min <br />-starting <br />Test Start Time: <br />11:00 am <br />11:00 am <br />12:30 pm <br />Initial Reading (Rj): <br />3 psi <br />3 psi <br />3 psi <br />Test End Time: <br />12:00 pm <br />12:00 pm <br />1:30 pm <br />Final Reading (RF): <br />3 psi <br />3 psi <br />3 psi <br />Test Duration: <br />1 hr. <br />1 hr. <br />1 hr. <br />Change in Reading (RF -RI): <br />Pass/Fail Threshold or <br />Criteria: <br />Test Result: <br />X Pass ❑ Fail X Pass ❑ Fail <br />X Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />IAapps\J0BS\2007\S01289.KINGCA\SB989 KINGCA.doc <br />