My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1993-1998
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
25651
>
2300 - Underground Storage Tank Program
>
PR0231628
>
COMPLIANCE INFO_1993-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:13 PM
Creation date
6/23/2020 6:50:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1993-1998
RECORD_ID
PR0231628
PE
2361
FACILITY_ID
FA0003835
FACILITY_NAME
SMK CHEVRON
STREET_NUMBER
25651
Direction
N
STREET_NAME
STATE ROUTE 99
City
ACAMPO
Zip
95220
APN
00514120
CURRENT_STATUS
01
SITE_LOCATION
25651 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231628_25651 N HWY 99_1993-1998.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
284
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />0 41 <br />high product level <br />low product level <br />high water level (at tank bottom) <br />111-11 .11114 11*611 Eell 10 4011JUM1 <br />a) The system is capable of performing precision tank tests to the highest <br />value, frequency and reliability as specified by U.S. EPA regulations and <br />applicable Local Codes (whichever is more stringent). It also has third <br />party certification. <br />b) Display of the date, time, and product level of the last successful test <br />for each tank for the following tests: <br />Annual Precision Test (e.g., 0.1 gph leak rate) <br />Monthly Precision Test (e.g., 0.2 gph leak rate) <br />• •• . • <br />Attempt a precision test every night during a defined period of time <br />with the ability to abort and restart the test, during and after a pump <br />cycle. <br />o Capability to perform leak testing at the command of the operator. <br />The system will wait for a prescribed period of time after a product <br />delivery and pumping cycle prior to starting a tank test or water <br />withdrawal. <br />Monthly Tank Test Required <br />Failed Monthly Tank Test <br />Loss of Product <br />(25 days since last achieved) <br />(e.g., 0.2 gph leak rate) <br />(unexpected drop in product level) <br />Nelms F-079110- I&= NMB= <br />° pump running <br />° line pressure (reading 0.1 psi increments) <br />° line is in test <br />011 •• r • • - <br />° Pump Failure (i.e., pump on but not requested, or <br />pump off during request) <br />..- <br />
The URL can be used to link to this page
Your browser does not support the video tag.