My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986-2005
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
90
>
2300 - Underground Storage Tank Program
>
PR0231741
>
COMPLIANCE INFO_1986-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2020 10:41:18 AM
Creation date
6/23/2020 6:51:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-2005
RECORD_ID
PR0231741
PE
2361
FACILITY_ID
FA0003657
FACILITY_NAME
AT&T Corp. - UE231
STREET_NUMBER
90
Direction
W
STREET_NAME
TURNER
STREET_TYPE
Rd
City
Lodi
Zip
95242
CURRENT_STATUS
02
SITE_LOCATION
90 W Turner Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231741_90 W TURNER_1986-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
333
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />This Section is subject to the General Conditions and Special <br />Provisions heading this specification as if herein repeated. <br />Contractor Beforeswork,AT&T Communications' Representative to discuss allphases of work to be performed. At this meeting anorder of procedure will be established which will bemutually satisfactory to both AT&T and Contractor. Nodeviation from the established order of procedure willbe permitted unless approved by AT&T. <br />•'i � � i., a M! <br />(a) Contractor will be held liable for any damage to the <br />facilities under the construction areas involved in this <br />specification and also for all consequential damages due <br />to any interruptions of communication services for the <br />general public which may result directly from any work <br />performed ■ <br />.ti.jt * contract.r- <br />Contractor shall furnish AT&T with a list of <br />subcontractors within five (5) days after the award of <br />Contractor shall not employ on work any unfit person or <br />anyone not skilled in the work assigned. <br />(c) Cleaning. <br />Contractors and each subcontractor for each portion of <br />the work shall at all times keep the premises and <br />buildings in a clean condition and shall remove all <br />debris and rubbish as fast as it accumulates and as <br />often as nay be directed. At completion of the work, <br />Contractor shall removeall debris, apparatus, and <br />surplus materials and shall leave the work in clean <br />condition a• ♦ a.a isworking order, all <br />to ._: <br />satisfaction of <br />(d) Contractor shall cooperate with AT&T and do his work in <br />such a way as '•create as little annoyancel: - <br />occupant as possible. <br />Spec B56K482 SMC114LPROVISIMS <br />IA..I <br />
The URL can be used to link to this page
Your browser does not support the video tag.