My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986-2005
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
90
>
2300 - Underground Storage Tank Program
>
PR0231741
>
COMPLIANCE INFO_1986-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2020 10:41:18 AM
Creation date
6/23/2020 6:51:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-2005
RECORD_ID
PR0231741
PE
2361
FACILITY_ID
FA0003657
FACILITY_NAME
AT&T Corp. - UE231
STREET_NUMBER
90
Direction
W
STREET_NAME
TURNER
STREET_TYPE
Rd
City
Lodi
Zip
95242
CURRENT_STATUS
02
SITE_LOCATION
90 W Turner Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231741_90 W TURNER_1986-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
333
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. COWLIANCE LAWS AND all-ANWRDSSSS <br />(a) Compliance. <br />Contractor shall ensure that all work complies with and <br />is performed in strict accordance with applicable <br />federal, state, county, administrative or municipal <br />codes, laws, ordinances, rules or regulations pertaining <br />thereto. If this specification or the drawings, for any <br />reason, do not adhere to the above codes, laws, <br />ordinances, rules or regulations, Contractor shall <br />request instructions from Engineer and complete the work <br />pursuant to such instructions and in strict accordance <br />with such codes, laws, ordinances, rules or regulations. <br />(b) Standards. <br />All work shall also be performed in accordance with <br />certain written standards of good working practice, such <br />as, but not limited to, wAmerican Concrete Institute", <br />"American Iron and steel Institutewj "National Fire <br />Protection Associatedw. <br />:0 This contract shall be governed by the laws of the Statz <br />of California. <br />(a) Should the work as constructed change from original <br />drawings and specification, Contractor shall show such <br />change on a record "As -built" set of drawings. <br />Contractor also shall cause subcontractors to keep a <br />record of such changes and report the changes to <br />Contractor prior to the final inspection. Contractor <br />shall submit all "As -Built" drawings to AT&T prior to the <br />final inspection. <br />OMMW�� <br />(a) Schedule of Values. <br />The Contractor shall submit to AT&T a schedule of values <br />within (7) days after the award of the contract. The <br />Schedule serves as basis for estimating the percentage of <br />work completed by line items and for determining monthly <br />progress payments. <br />The Contractor shall submit to AT&T a progress schedulz <br />within (7) days after the award of contract. This <br />schedule shall be confirmed and updated on a monthly <br />basis. <br />Spec B56K482 SPECIAL PROVISIONS <br />14-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.