Laserfiche WebLink
VEEDER-ROOT PRESSURIZED LINE LEAK DETECTION Mw� <br /> SITE PREPARATION AND <br /> INSTALLATION INSTRUCTIONS <br /> C. CONDUIT BETWEEN THE TLS MONITOR AND <br /> &IPA WARNINGS: SUBMERSIBLE PUMP MANHOLE...........................3 <br /> V If's <br /> SUBSTITUTION OF COMPONENTS MAY SECTION 4. FIELD WIRING INSTALLATION............4 <br /> IMPAIR INTRINSIC SAFETY. A. LINE LEAK SENSOR FIELD WIRING <br /> CIRCUITRY WITHIN THE CONSOLE BAR- <br /> RIER FORMS AN INTRINSICALLY SAFE, INSTALLATION.......................................................... 4 <br /> ENERGY LIMITED SYSTEM. THIS SYSTEM <br /> MAKES THE PLLD INTRINSICALLY SAFE B. PUMP CONTROL FIELD WRUNG INSTALLATION-4 <br /> FOR USE IN A CLASS I GROUP D HAZARD- C. PLLD CONTROLLER MODULE POWER WIRING.4 <br /> OUS LOCATION. THE SENSOR WIRING IS <br /> INTRINSICALLY SAFE ONLY WHEN CON- SECTION 5. PLLD SYSTEM INSTALLATION..............8 <br /> NECTED TO FORM NUMBER 8470 AND 8482 <br /> CONSOLES. A. PUMP PORT STRAINER INSTALLATION <br /> EXPLOSION AND/OR EQUIPMENT DAM- (For In-Line Check Valves only) 8 <br /> AGE COULD OCCUR IF CONDUITS DO NOT B. PLLD IN-LINE CHECK VALVE INSTALLATION <br /> ENTER THE TLS-350 OR TLS-3508 MONI- <br /> TOR THROUGH THEIR DESIGNATED PRE- (For Red Jacket and Tokheim Pumps)...........................8 <br /> FORMED KNOCKOUTS. C. SWIFTCHECK'VALVE INSTALLATION <br /> TO AVOID ELECTRICAL SHOCK WHICH <br /> COULD KILL YOU, BE SURE AC POWER TO (FOR RED JACKET AND TOKHEIM PUMPS).........9 <br /> THE TLS-350rrLS-350R MONITOR AND SUB- D. LINE LEAK SENSOR INSTALLATION.....................9 <br /> MERSIBLE PUMPS IS OFF DURING INSTAL- <br /> LATION. E. DISABLING THE FUNCTIONAL ELEMENT.........10 <br /> IN INSTALLATION OF THIS PRODUCT, COM- SECTION 6. WIRING CONNECTIONS........................11 <br /> PLY WITH THE NATIONAL ELECTRICAL <br /> CODE; FEDERAL, STATE AND LOCAL A. GENERAL WIRING PRACTICES........................... 11 <br /> CODES; AND OTHER APPLICABLE SAFETY <br /> CODES. B. PRESSURIZED LINE LEAK INTERFACE <br /> TO PROTECT YOURSELF AND OTHERS MODULE WIRING CONNECTIONS.......................II <br /> FROM BEING STRUCK BY VEHICLES, C. LINE LEAK SENSOR FIELD WIRING <br /> BLOCK OFF YOUR WORK AREA DURING <br /> INSTALLATION OR SERVICE. CONNECTIONS.........................................................12 <br /> FAILURE TO COMPLY WITH THESE WARN- D. PUMP CONTROL WIRING.......................................12 <br /> INGS COULD RESULT IN DEATH, SERIOUS <br /> PERSONAL INJURY, PROPERTY LOSS AND SECTION 7. SYSTEM CHECKOUT AND <br /> EQUIPMENT DAMAGE. INSPECTION..............................................15 <br /> SECTION 1. INTRODUCTION........................................ <br /> A. GENERAL................................................................... 1 A. WARNING TAGS...................................................... 15 <br /> B. DAMAGE CLAIMS..................................................... B. PLUMBING CHECKOUT.........................................15 <br /> C. RETURN SHIPPING.................................................... <br /> D. SYSTEM REQUIREMENTS....................................... SECTION 8. WARRANTY CONDITIONS AND <br /> E. SYSTEM DESCRIPTION............................................ I LIMITATIONS OF LIABILITY...............16 <br /> SECTION 2. SITE PREPARATION REQUIREMENTS 2 A. LIMITATIONS OF LIABILITY................................ 16 <br /> A. MANHOLES ............................................................... 2 <br /> B. SUBMERSIBLE PUMP...............................................2 B. INSPECTION..............................................................16 <br /> C. STAGE II VAPOR RECOVERY..................................2 C. LIMITATION OF REMEDY AND WARRANTY.....16 <br /> D. PIPING RUNS..............................................................2 <br /> E. WIRING REQUIREMENTS........................................2 D. LIMITATION OF DAMAGES....................................16 <br /> SECTION 3. CONDUIT INSTALLATION......................3 E. LIMITATION OF ACTIONS......................................16 <br /> A. CONDUIT RUN CONSIDERATIONS....................... 3 F. COLLATERAL PROMISES........................................16 <br /> B. CONDUIT BETWEEN THE TLS MONITOR AND <br /> SUBMERSIBLE PUMP RELAY CONTROL BOX....3 G. INTERPRETATION....................................................16 <br />